2. Installation of Nylofor City
To obtain the best result, it is recommended to level the ground over the
whole length of the fence
Align the fence line
For correct positioning, maintain the centre-centre distance of 2530mm
(with a tolerance of +/- 5 mm)
To determine the dimensions of the foundations it is recommended to
consult a specialized engineer to evaluate wind load and solar conditions and
any other factors requiring specialist opinion (concrete quality directive B30)
In case of instant installation the post needs to be supported as long as
necessary
2.1 Foundations
center-center
9 10/02/2015 – Nylofor
®
City Installation Manual
Содержание Nylofor City
Страница 1: ...Nylofor City Installation manual EN...