1. Components of the fencing system
1.2 The panels
Nylofor City is always installed with Nylofor F panels. Panels with
overhangs are mounted with the pins on the bottom
A top rail is mounted on top of the panel to have additional rigidity,
standard length 2505mm
Neoprene strips are glued in between the top rail and the Nylofor F
panel to avoid vibrations that can cause noise (3 pieces/panel)
32,5
31,5
1,5
20x5x100mm
TOP RAIL
NEOPRENE
STRIPS
5 10/02/2015 – Nylofor
®
City Installation Manual
Содержание Nylofor City
Страница 1: ...Nylofor City Installation manual EN...