2. Installation
2.
Installation of posts & panels
INSTALLATION OF THE PANELS
-
Join two panels together on an intermediate post
at the correct height
-
Place a clamp in the upper insert of the post and
tighten the security bolt halfway
-
Now place an additional clamp in the lower insert and
tighten the security bolt halfway
-
Repeat this procedure for all intermediate posts
and finish with the corner post
-
Now place the bolts into the other clamps and
tighten all bolts completely and firmly
-
Finally, cover the clamp holes with a cap
Panel height
Number of
fixators
630mm
3
1030mm
3
1230mm
4
1430/1530mm
4
1630/1730mm
5
1830/1930mm
5
2030mm
6
2430mm
7
14
FIXATORS PER POST
18/05/2020 – Nylofor / Twilfix
®
- Installation manual