HoriZen
®
Please note for all HoriZen construction
elements:
Unassembled panels may become warped if
stored incorrectly, i.e. not upright. Avoid
point loads, especially with profiles and
strips.
Protect materials from rain, snow, and direct
sunlight when stored to avoid excessive
temperature fluctuations of the material.
Do not assemble in frost or high
temperatures. The outside temperature and
ground temperature should ideally be
b5°C and +25°C. The HoriZen
elements must be able to adapt to this
temperature prior to assembly.
The assembly of all HoriZen construction
elements must only be carried out with the
appropriate and proven HoriZen components
from Betafence and as described in the
current assembly instructions at the time of
assembly.
Working with HoriZen Prime WPC:
The profiles can be cut with hard metal tools.
Working with ALU :
Construction elements in aluminium or steel
can be shortened with a fine-toothed saw blade
for metal or with a hacksaw.
TIP:
Do not cut aluminium or steel materials
with a grinder! The material may burn and
the lacquer flakes off. To prevent corrosion,
coat the cut areas with a commercial
varnish, and allow to dry before installation.
Safety instructions and tips
for transport, storage, and handling of HoriZen components
5
HoriZen Posts – Accessories and
ground attachment.
We differentiate between posts that are directly
sunk into concrete and posts that are installed
on top of concrete with a floor plate.
Posts Length
Ground attachment
1930 mm
Ground anchor/footplate or
into concrete if fence height
max 1300mm
2400 mm
sunk into concrete
2980 mm
sunk into concrete
Explanation of the symbols
Drill with the indicated diameter.
Element can be shortened or must
be shortened to the indicated size.
Glue construction elements.
Screw tight with the specified torque.
Remove protective film at room
temperature before installation.
Article must not be installed upside
down.