2
OPERA
TION
30
GB
STARTUP (only with kickstarter)
- Open fuel tank valve
A
OFF = closed
ON = open
RES = reserve
- Check that the gears are in neutral
- Position the key to
(see page 19).
- Depress the kick-starter with a sharp move-
ment of the foot and slightly turn the gas
control.
NOTE:
When the engine is cold, use choke
A
, start
and wait a few seconds; and then return
the lever to its starting position.
ENGINE SHUT-DOWN
To shut-down the engine, proceed in one
of the two following ways:
- turn the key to
(see page 19).
- press the button
on the switch unit
(see page 11).
NOTE:
Always close the fuel tank valve when the
engine is off.
A
B
Содержание RR 50 CC series
Страница 4: ...INDICE 4 GB CHAPTER 6 TROUBLESHOOTING 45 Troubleshooting 46 INDEX 47 ...
Страница 24: ...1 GENERAL INFORMATION 24 GB ELECTRICAL DIAGRAM RR 50 ...
Страница 44: ...4 ADJUSTMENTS 44 GB ...
Страница 45: ...5 TROUBLESHOOTING 45 GB CONTENTS CHARTER 5 TROUBLESHOOTING Troubleshooting INDEX ...
Страница 48: ......