78
GB
IMPORTANT
We recommend you to check all the tightenings after the first one
or two hours’ ride over rough ground. Special attention should
be paid to the following parts:
•
rear sprocket
•
ensure that the footrests are properly fixed
•
front/rear brake levers/calipers/discs
•
check that the plastics are properly fastened
•
engine bolts
•
shock absorber bolts/swingarm
•
wheel hubs/spokes
•
rear frame
•
pipe connections
•
tensioning the chain
IMPORTANT
For any servicing requirements, please get in contact with
Betamotor’s authorized service network.
Содержание RR 250
Страница 26: ......
Страница 60: ......
Страница 73: ...6 TROUBLESHOOTING 149 GB CONTENTS CHARTER 6 TROUBLESHOOTING INDEX ...
Страница 76: ...152 ...