NOTE:
It is imperative to check that the hydraulic connectors
are not obturated.
OPERATION
1) Open/unscrew the Air Purge Valve on the top of the Filter Pump; air is released as water fills the Filter Pump.
2) When water comes out of the Air Purge Valve screw it closed and wipe away any water.
3) To start the Filter Pump, insert the plug into a residual current device (RCD).
4) To start the Filter Pump, insert the plug into a circuit of alternative residual power (DDR) For France Only.
5) Turn on the switch to the “I” position.
PEDESTAL FIXING Fig.1
The filter pump must be vertically fixed on ground or a certain
pedestal made of wood or concrete before use. There should
be two holes 7mm in diameter on the pedestal, the space
between which should be 256mm. Put filter pump on the
pedestal and fix them together by fasten the bolts and nuts. All
the pedestal parts should weigh over 18kgs at least to prevent
the pump from accidental falling.
256
270
300
450
2-M6 bolt
2-M6 nut
Fig.1
6
OPTION 2
1
2
3
4
P04060
A
B
A
A
B
A
B
P04060
P6029ASS16