Installation
6
Axxium
t
Pro 9910 Installation Guide for IBM Applications
S
LTM-1341 A
Uncontrolled Copy
Power and Battery Module Installation
W A R N I N G
S
The UPS must be connected to an electrical system that meets all applicable
electrical code requirements, including grounding requirements.
S
Only qualified service personnel (such as a licensed electrician) should perform the
electrical installation. Risk of electrical shock.
Use the following procedure to install the power and battery modules:
1.
Remove the front covers of the power enclosure.
The covers have spring latches on the left and right sides that
hold them in place.
NOTE
The battery modules MUST be installed at the bottom of the power enclosure.
Two battery modules (side-by-side) are required to complete each battery string.
2.
Insert the battery modules into the power enclosure.
Push each module firmly until the front latch snaps to secure
the battery module (see Figure 4). Repeat for each additional
battery module.
3.
Insert the power modules into the upper slots of the power
enclosure.
To insert a power module, tip the front down slightly and lift
the rear edge over the safety stop on the center support rail.
Keep the module handle extended until the module is fully
inserted (see Figure 4).
4.
Raise the power module handle to secure the module into the
rack. Tighten the thumbscrew on the handle.
5.
If you are installing an optional battery enclosure, repeat
Steps 1 through 2 to install the battery modules. Verify that the
DC breaker on the back of the battery cabinet is closed (pulled
out).
6.
Reinstall the front covers.
Содержание Axxium Pro 9910
Страница 63: ......