Optional ridge vent provides
ideal ventilation.
Air
Space
Truss
Shingles
Step 16 Install Rear Gable Trim
Install 87" long 1x6 gable trim over the 1x4 boards.
Install trim flush with the top of the roof sheathing.
Install vinyl outside corners
under the 1x6 gable trim.
1x4 Filler Board
Slot For Vinyl
Step 15 Install Fascia Trim & Roof Sheathing Continued
1x6 Gable Trim
2.
Install roof sheathing per layout below. Make sure the trusses are plumb and the roof sheathing
meets the center of the truss. Use 7d sinkers spaced 12" apart. The top row of roof sheathing
will be about 1" below the ridge to allow for ventilation. Important: Make sure the front gable
is plumb and the roof sheathing extends 8-1/2" past the siding along the face of the gable.
48" x 72"
48" x 48"
48" Long
Panel
3.
Install a 1x6 - 7' fascia board. Install a 22-1/2" long 2x4 soffit block,
with beveled edge, between the truss.
4.
Cut a 1x6 - 7' fascia board flush with the end of the roof sheathing.
81-1/2" Long Panel
Sheathing Will Extend
8-1/2" Beyond Gable
72" Long Panel
1x6 - 7' Fascia Boards
48" x 72"
48" Long
Panel
2x4 Block
48" x 57-1/2"
Remove From Pallet