Assembly Book

the Hanover

12' x 20'

Содержание the Hanover

Страница 1: ...rive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright...

Страница 2: ...there are some 16 wide siding panels and trim boards that will not be used in the constructions of this model Our framing lumber is imported to provide you the highest quality available However if yo...

Страница 3: ...er 4x4 12 Runner 6 Cut 2 two 2x4 12 to a length of 12 0 Layout for 16 joist spacing see above 7 Install floor joists between the joist headers Square floor section Measurement will be 203 5 8 Install...

Страница 4: ...stall a 2x4 90 collar tie between the 2x4 boards Hold in place with 2x4 blocks Install 12 x24 gussets to the ends of the collar tie Glue and nail using 14 nails per gusset 5 Turn this truss over and a...

Страница 5: ...ate 2 Place 2 two truss members in the jig Secure the top together with a barbed metal plate 3 Remove the 2x4 blocks at the corners of the floor and insert the gable plate assembled above into the bir...

Страница 6: ...e 1x4 later Do not install 1x4 boards on the other gable 1x4 Board Cut to Fit 2 Install gable siding using 6d galv nails across the top of the gable frame Use 8d galv nails along the bottom edge Step...

Страница 7: ...her with the letters A and B 68 1 2 Wall Plate 24 19 3 4 24 23 1 4 68 1 2 Wall Plate A B 3 Square wall frame Measure diagonally corner to corner The measurements will be the same when the wall is squa...

Страница 8: ...and 2 two 2x4 72 boards together and indicate with X marks where the wall studs will be located 2 Install 72 wall studs between the top and bottom plates Nail both wall frames together 3 Repeat to ass...

Страница 9: ...sidewalls assembled in Step 5 Butt a 10 wall frame against the wall with siding DO NOT nail these frames together so they can be separated later 10 Wall Panel from Step 5 6 Wall Plate 2 Square the wal...

Страница 10: ...ut 2 two 11 plates from a 34 3 4 long 2x4 Assemble wall frame using 2 two 72 wall studs and 2 two 11 long 2x4 wall plates 2 Assemble the larger wall frame using 4 four 72 wall studs and 2 two 58 1 2 l...

Страница 11: ...header support The siding will edge extend 3 1 2 beyond the end of the frame The siding should extend 3 4 below the bottom plate 71 1 2 Header Support 6 Install the remaining siding on the other front...

Страница 12: ...ding from door header 4 Install a 4 1 4 x 64 1 2 panel to the door header Install siding flush with the top edge and 1 1 2 from each end Step 9 Set Walls 1 Secure wall panels together at the corners U...

Страница 13: ...10d sinkers Sidewall Step 10 Install 2x4 Tie Plates 2x4 6 Tie Plates 2 Install another 2x4 6 board next to the first one 3 Install 2 two 48 long 2x4 at the front of the building 4 Install 2x4 tie pla...

Страница 14: ...nails you may want to move the trim later when you install the doors Use 8d galv nails 3 Locate a 1x3x71 3 4 board with angle cuts on both ends Cut the board length flush with the side door trim Cut...

Страница 15: ...pposite wall place the X mark on the same side of the line so your trusses are parallel when they are installed 2 Install metal hangers to the tie plate with 1 1 2 hanger nails The opening should line...

Страница 16: ...ls Step 14 Install Eave Soffit Cut leftover siding and install as soffit under the truss overhang Use 8d galv nails Step 15 Install Fascia Trim Roof Sheathing Sidewall 1 Starting at the rear of the bu...

Страница 17: ...oof sheathing meets the center of the truss Use 7d sinkers spaced 12 apart The top row of roof sheathing will be about 1 below the ridge to allow for ventilation Important Make sure the front gable is...

Страница 18: ...the 2x4s Install trim flush with the top of the roof sheathing Install the siding according to the manufacturer s instructions Starter Strip is installed along the bottom of the building Center the na...

Страница 19: ...in or out to make the door spacing equal 5 Install hinges to trim with 2 screws OSB Shim 1 Lay the left door with the trim facing up The siding on the left door extends past the door trim See detail...

Страница 20: ...6 Gable Trim 87 6 ea 1x6 Fascia Trim 84 8 ea 1x4 Corner Trim 75 3 4 4 ea 1x4 Wall Trim 72 2 ea 1x3 Door Trim sides 72 1 ea 1x3 Door Trim top 71 3 4 2 ea Pre built Doors 32 x 71 3 4 1 ea Pre built Door...