background image

f<

b&3;5$$(6+&;+:(3#%#&'<(bA(97"(8":6253+%(5(3"&@":3;(>#&%7>(97"(459(6";(;2+(78+&#&'(#&(;2+

3#%#&'(5;(;2#3(;#4+<(b&3;:"6;#7&3(5:+(856P+%(#&(;2+(>#&%7>(@7/<(b;(#3(5%V#35@$+(;7(#&3;5$$(;2+
>#&%7>(5A;+:(;2+('5@$+(#3(3+;

Step 12B

Install Gable Siding continued

Step 13

Install Gable Overhang

_<

b&3;5$$($53;(3#%#&'(85&+$<

,<

D765;+(W-X(;>7(iiHfdKe($7&'(-/_(:5A;+:3(7&('5@$+<(b&3;5$$(-/_3(A$"32(>#;2(;2+(;78(7A('5@$+

A:54+<(=3+(,G%(3#&P+:3<

-<

D765;+(W-X(;>7(fGH,d_e($7&'(-/_(:5A;+:3(5&%(#&3;5$$(;7(A#&#32<(-/_3(>#$$(+/;+&%(@+97&%(+&%(7A

'5@$+<

30-3/4" Long 2x4

77-3/8" Long 2x4

Do not remove the temporary 1x4 blocks until
the roof trusses and back gable are assembled.

Содержание Springfield

Страница 1: ...sed September 16 2021 Assembly Book Best Barns USA 0 12 3 45 5 3 6789 2 2 6789 2 5 3 2 3 45 5 459 7 678 27 7 85 27 67 3 A 74 B C7 3 DDE F E789 2 G Manufactured by RBS Holdings LLC 205 Arlington Drive...

Страница 2: ...7 4 5 77A U 8 O B77A Z5 3 7 6 3 N5 S8 7 5 T E5 P B J 77 T 77 A 77 3 37 78 7 5 9 7 459 62773 7 97 7 7 87 5 6 4 85 1 4 7 7 9T Q 5 H E7 A 4 67 3 5 5 G 3 N 4 H E7 A 4 5 3 5 33 3 5 3 5 2 V 65 9 5 N 5 H 17...

Страница 3: ...3 3Q 5 17 5 A 54 7 2 _ _ 3 b 3 5 2 A 77 2 K 5 V5 5 3 3856 Ke 585 f E _H A 77 a7 3 7 H e Treated lumber may be thicker than 1 1 2 Take this into account when cutting the length of floor joists Shorten...

Страница 4: ...3Q 5 E W X 7 _H 7 5 2 7A __e N73 7 2 75 3 7 2 5 65 2 h 45 P3 2 2 5 3 3 765 24 23 1 4 __e Wall Plate 24 144 Wall Plate Pre Cut Wall Studs b 3 5 WiX 3 V 8 H6 5 3 3 2 78 7 74 8 5 3 Z5 3 3 7 5 8 5 3 2 G...

Страница 5: ...8 H6 5 3 3 2 78 7 74 8 5 3 2 G 3 P 3 Step 3 Assemble Door Header 185 Wall Plate 24 19 3 4 KMe Wall Plates 24 Pre Cut Wall Studs 76 1 4 Long 2x8 48 OSB Filler Cut OSB to fit D765 W X 7 KHK 75 3 E 2 3...

Страница 6: ...ng Extends 3 4 Below Header Siding Extends 3 4 Below Plate 2x8 Door Header 75 1 2 Header Support nail nail E W X 7 _H 75 3 7 5 2 7A __e A7 5 8 5 3 N73 7 2 75 3 7 2 5 65 2 h I5 P3 2 2 5 3 3 765 f E W X...

Страница 7: ...7 3 5 5 A 2 3 85 2 2 DLN A 32 2 2 3 7 56P 5 327 fd_e 7 7 74 8 5 Z5 3 7 56P 5 5 5 _3 3 0 5 V 5 3 3856 Ke 585 Step 5 Set Walls f b 3 5 WfX 2 47 3 85 3 D53 85 588 7 45 9 fH d e 853 5 A 54 7 6 V A 7 5 85...

Страница 8: ...5 7 3 5 _ 7 2 78873 3 5 f E W X 7 7 _3 7 A 3 5 8 5 3 5 3 5 7 A 7 5 56P 5 3 Cut 2x4 12 to Fit 2x4 16 Tie Plate 2x4 16 Tie Plate Step 7 Install Metal 2x4 Joist Hangers b 3 5 W _X A7 _ a7 3 25 3 5 2 2 5...

Страница 9: ...d layout it is important to install sheathing staggered E WiX 3 V _H 75 3 7 5 2 7A fie 5 3 5 2 4 5 25 3 3 H d e 25 5 3 Important Before securing the 2x4 floor joists make sure the side walls are plumb...

Страница 10: ...P 5 E 2 37 4 3 A 32 2 78 7A S A 5 7 74 7A 3 b 3 5 4 A 32 2 2 3 7 2 3 5 3 3 0 5 V 5 3 3856 e 585 7 3 5 5 4 1x4 Trim Boards f b 3 5 W X 7 i e 7 _ 4 75 3 67 75 3 1 4 327 A 32 2 S 32 5 2 E 75 7 A _ B 8 5...

Страница 11: ...2 3 67487 3 7 2 53 327 7 2 5 67 6 9 2 7 74 _3 3 5 2 5 4 53 HGe A 74 7 Pre built gable ends highlighted in gray f 1 487 5 9 56P _ 76P3 7 7A A 77 5 7 2 A 54 4 4 3 12 3 76P3 KeH e 7 5 459 25V 5 3 I5P 3 W...

Страница 12: ...V 2 3 5 2 5 3 D765 8 H6 5 3 7 P A 7 2 3 5 5 3 85 2 5 7 5 7 2 3 b 3 5 A 32 2 7A A 54 5 fd_e 7 2 7 74 _ 8 5 3 0 5 V 5 3 3856 Ke 585 M D765 W X 7 MGHfd_e 7 _3 b 3 5 2 3 Q 5 9 3856 A 74 6 7A 2 5 6 2 7 74...

Страница 13: ...nstall Gable Siding continued Step 13 Install Gable Overhang _ b 3 5 53 3 85 D765 W X 7 iiHfdKe 7 _ 5A 3 7 5 b 3 5 _3 A 32 2 2 78 7A 5 A 54 3 G 3 P 3 D765 W X 7 fGH d_e 7 _ 5A 3 5 3 5 7 A 32 _3 97 7A...

Страница 14: ...53 65 5 7 W X 7 iiHfdKe 7 _3 5 5 3 2 33 3 B 47V 2 _ 76P3 25 3 6 2 7 74 5 8 5 5 873 7 7 P 8 5A 3 5 D765 5 KH d e 7 _ 76P 2 5 3 5 3 5 5 8 5P 6 5A 3 5 76P 5 8 5P 2 5 77 33 b 3 5 2 W _X A7 0 67447 5 3 f...

Страница 15: ...e soffit if the corner and side wall trim are installed first This enables the soffit to rest on the trim where it meets the building See lower detail 99 Corner Trim 3 8 Gauge Block D765 5 fdKe fe Ke...

Страница 16: ...3 f D765 WMX A V Hfd_e _Ke 37AA 85 3 I 53 A 74 6 7A A 3 33 7 7A 37AA 7 5 E 7 37AA 85 7 2 3 2 I5P 3 DLN 3 2 3 6 7AA _ Z5 2 37AA 85 7 2 7A 2 _3 Detail C 7 M b 3 5 A7 37AA 85 3 5 7 2 3 7A 2 6 2 53 37AA 8...

Страница 17: ...Back Gable 48 x 51 48 x 96 48 x 75 51 48 48 x 96 48 48 x 59 1 4 48 x 35 1 4 59 1 4 Step 20 Install 1x6 Fascia on Side Walls 1x6 Fascia Board b 3 5 W X 7 0H0 4 75 3 E 2 53 4 75 A 32 2 2 A 7 37AA 7V 25...

Страница 18: ...56P 5 0 12 78 7 7A 32 5 2 5 7 5 58 5 2 78 A7 V 5 7 A V 3 588 b 3 W X 7 8 9H6 83 7 2 77A 32 5 2 562 33 5 2 78 7 3 5 7 8 V 7 3 85 A 32 Step 21B Install Roof Sheathing continued Step 22 Install 2x4s in...

Страница 19: ...7 5 a 3 2 4 2 97 3 5 2 77 3 82 Long 1x4 Door Trim 3 4 Above Door Opening Siding is 3 4 Below Trim S A 7 5 3 5 W X 7 0 4 75 3 7V 2 _ 75 3 A 32 2 2 78 7A 2 S 77A 32 5 2 3 0 5 V 5 3 b 3 5 5 4 7 2 5 5 St...

Страница 20: ...3 6 2 3 77 8 56 2 6 73 7 7 5 27 A7 2 7 325A 7 78 7 i b 3 5 5 7 2 5 7 5 2 78 7A 2 77 Barrel Bolt on the back of left door Step 25 Install Doors _ J 54 _ 1 4 b 3 U77 D5 62 U77 78 b 3 5 WfX 2 0e 2 3 7 3...

Страница 21: ...Roof Covering B77A 2 3 K 863 B77A 8 O H G b 3 5 A 858 5 32 3 5667 7 45 A56 3 3 6 7 3 Install Roofing Not Supplied in Kit Roof Sheathing 1x6 Trim Metal Roof Edge b 3 5 4 5 77A 5 7 2 5 3 5 2 A 7 7A 2 77...

Страница 22: ...863 _ H 0 5 1 N 5 3 863 K H K U77 C 5 f 863 O 7 _ K 863 S 2 5 2 _ K Qty Material Shipped in 36 Door Kit 5 f0e i0e N H U77 3 5 e f e 1 5 37 7 3 5 _e iKH d_e U77 1 4 5 _e K e U77 1 4 5 _H d_e iMH d e U7...

Страница 23: ...ton _ 5 f e E7 1 4 _ 5 _ e E7 1 4 _ 5 0e G_e Y5 1 4 id 0e _Ke _e S 2 5 2 id 0e _Ke M e S 2 5 2 id 0e _Ke _Ke S 2 5 2 id 0e _Ke iMe S 2 5 2 _ id 0e Hfd_e _Ke S 2 5 2 id 0e Hfd_e M e S 2 5 2 id 0e Hfd_e...

Страница 24: ......

Отзывы: