Northwood Deluxe

14'x10'

Revised on November 2, 2021

Assembly Book

Содержание Northwood Deluxe

Страница 1: ...n Drive Geenville PA 16125 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2011 Northwood Deluxe 14 x10 Revised on November 2 2021 Assembly Book ...

Страница 2: ... help barnkits com The material that is included in our kit is listed on the back page The optional floor package if purchased will be supplied by a local lumber supplier Our kit does not include the shingles the quantity needed is listed on the back page The siding is primed You will need to apply a finish coat using latex acrylic paint Most buildings are installed on a wood floor and the siding ...

Страница 3: ...1 Cut joist headers to floor length See Below Layout for 16 on center joist spacing X marks where floor joist will be placed X X X X X X 16 15 1 4 Joist Header X X 16 4x4 Treated Runners Joist 9 9 Long 2x4 Joist Header 13 9 Floor Length Material Description 14 x 10 shed 2x4 Joist Headers 2 pcs 14 2x4 Floor Joist 12 pcs 10 4x4 Treated Runners 6 pcs 8 Flooring 5 8 or 3 4 5 pcs 4x8 Screw Floor Nails ...

Страница 4: ...flat spot on the bottom 2x4 See Detail A below 2 Affix 2x4 blocks around the truss members to hold them in place Tack a 3 wide gauge block in hardware bag at both ends of the bottom 2x4 to maintain the correct overhang 3 Secure the tops together with a wood gusset Apply wood glue with a brush between the 2x4 boards and the gusset Nail the gusset to the 2x4s with 6d common nails Use 14 fourteen nai...

Страница 5: ...top and bottom 2x4s The siding will secure them in place 3 Starting from left end install a gable siding with the LAP edge flush with end of gable The siding should extend 3 4 below the lower 2x4 Nail siding to the frame with 6d galv nails spaced 8 apart 4 Install center and right panels If necessary cut last panel flush with end of gable frame 5 Turn gable frame over and install 18 long 2x4 block...

Страница 6: ... and a 72 long 2x4 as tie plates over the top plate The tie plates will extend 3 1 2 beyond the frame on each end Use 10d sinkers spaced 16 apart Step 3A Assemble Back Wall 45 Tie Plate 48 Tie Plate 72 Tie Plate 45 Tie Plate 68 1 2 Top Plate Wall Stud 3 1 2 175 175 68 1 2 Wall Frame 89 1 2 Wall Frame 1 Locate 2 two 2x4 boards 68 1 2 long Locate 2 two 2x4 boards 89 1 2 long Position these boards to...

Страница 7: ...ld extend 3 4 below the bottom plate and extend above the 2x4 tie plate Use 6d galv nails spaced 8 apart 6 Install 2 two more full width siding panesl next 7 Install a 20 3 4 wide siding panel last It will extend 3 1 2 beyond the wall frame Tip You may wish to not install the last two siding panels in this step This will make the wall ligther and easier to handle Once wall is erected you can finis...

Страница 8: ...ds between the top and bottom plates Nail both wall frames together 3 Locate the 2x4s removed from the shipping pallet Cut 2 two of the 2x4s to a length of 74 Select another 2x4 and cut 2 two 39 long 2x4s Save the other 2x4 for wall bracing 4 Install 39 and 74 long 2x4s as tie plates over the top plate The 2x4 tie plates will set back 3 1 2 from the end of the wall frame 74 Tie Plate 141 1 2 141 1...

Страница 9: ...nel with LAP edge last 1 Repeat Step 4A to assemble another side wall Orient the C mark on the wall frame to the left LAP Edge LAP Edge Tongue Edge Cut Edge Step 5 Assemble Right Side Wall Tongue Edge 3 Install a full width siding panel 4 Install a 45 wide siding panel last 2 Install a 27 3 4 siding panel with cut edge and tongue edge flush with the end of the wall and extending 3 4 below the bott...

Страница 10: ...nd of the frame Top of 2x4 will be 3 1 2 below top plate Use 4 four 10d sinkers 79 3 4 Plate 71 1 2 Header Support 16 1 2 Step 6 Assemble Door Walls 24 24 3 Install 2 two 72 wall studs between 2 two 10 3 4 long 2x4 wall plates 4 Install a 71 1 2 long 2x4 as a header support on the end of the frame 10 3 4 Plate 10 3 4 Plate 71 1 2 Header Support 3 1 2 Below Plate 3 1 2 Below Plate ...

Страница 11: ... to the 16 wide panel If you are installing optional windows you can out the openings now or later 4 Install a 21 1 2 wide siding panel the siding will extend 3 1 2 beyond the wall frame 2x4 Header Support Cut Edge LAP Edge 1 Select the larger wall frame Siding Extends 3 1 2 Past Wall Frame 5 Install a pre cut 16 wide siding panel with the cut edge flush with the 2x4 header support The siding will...

Страница 12: ...s 1 1 2 above the top of the door header to receive 2x4 tie plate Nail through the wall stud into the ends of the header Toenail into the top wall plates Use 10d sinkers Wall trim installed later will hide where the siding butts the front wall panels 3 Install a 2x4 7 board from shipping pallet at the door opening to hold the wall straight View From Inside 2x4 45 2x4 72 4 Install a 45 a 72 and a 4...

Страница 13: ...two lx3x72 trim boards along each side of the door opening with top of boards 3 4 above door Tack these boards with a couple nails you may want to move the trim later when you install the doors 2 Install a 1x3x71 3 4 board that has angle cuts on both ends over the door opening There should be 3 4 of siding exposed below this board 3 IInstall 1x4x77 1 4 trim boards at the front and rear corners of ...

Страница 14: ... with X marks where the trusses will be located on the front wall Measure from the inside face of the gable to the first X mark Important When marking the back wall place the X mark on the same side of the line so your trusses are parallel when they are installed 1 Install the gable on the right side wall The gable frame will butt against the back wall siding and extend over the front wall Gable s...

Страница 15: ...nt the 2x4 should be centered not the wood gusset over the X mark on the rear 2x4 plate Check the truss spacing front and back to make sure the truss is parallel with gable Step 12 Install Rear Soffit Trim 2 Install 3 more soffit panels cutting last one to fit 1 Locate 4 four 3 x48 3 4 soffit panels with a beveled edge Cut the first soffit panel along the LAP edge so the tongue edge is centered to...

Страница 16: ... LAP edge so the tongue edge is centered on the second truss Use 6d galv nails 3 Install 3 more soffit panels cutting last one to fit Step 14 Install Gable Trim Step 13 Install Front Soffit Install the 1x4 gable trim extending 1 2 above the 2x4 on the gable When installed later the roof sheathing will be flush with the top of the trim Siding Soffit Panel Trim 1 2 Above 2x4 ...

Страница 17: ...all a 48 x 72 roof panel on the lower right corner Use 6d common nails spaced 12 apart 3 Install a 48 long roof panel at the top The top sheathing will be 1 below the peak of the trusses 7 Install 1x6 fascia and roof sheathing at the back of the building 4 Install a 48 long 1x6 trim board 5 Cut and install a 50 long 1x6 trim board flush with the gable trim on the left gable 6 Install the remaining...

Страница 18: ... 2 Install shingles according to the instructions on the wrapper Install Roofing Not Supplied in Kit 1 Install metal roof edging perimeter of the roof area If you are not installing shingles at this time you can purchase felt paper to protect the roof sheathing Install the felt paper before you install the metal roof edge Building Tip Install ridge vent in lieu of shingles caps Ridge vent provides...

Страница 19: ...m in or out to make the door spacing equal 5 Install hinges to trim with 2 screws OSB Shim 1 Lay the left door with the trim facing up The siding on the left door extends past the door trim See detail below 2 Install 5 hinges to the left side of the door frame To position the hinge properly hold the rectangular plate against the frame Use 1 3 4 black screws 3 Install hinges to the right side of th...

Страница 20: ... 6 Gable Blocks angle ends 18 2 Wall Plates 10 3 4 6 5 Door Hinges 8 Blocks for truss jig 10 12 2 Barrel Bolts 2 Gauge Blocks for trusses 1 Door Latch 1 Bottle Glue 2 48 x 72 Roof Sheathing 48 Hinge Screws 4 48 x 48 Roof Sheathing H1 Truss Hangers 2 Screw Bits 2 31 1 2 x 72 Roof Sheathing 2 1x4 Metal Barbed Plates 4 31 1 2 x 48 Roof Sheathing 4 24 x 48 Loft Flooring 3 3 4 16 x 48 Loft Flooring 1 1...