c4
a($1'**%+2(12/%$#3#(0%-'(2*4%>,+'12%$)(8)/$1%6#(3,67%
packed in dormer carton
7%'(3%+)1%,)1
$#3#(0 '++,/3#(0 1, 6#(3,6 #($1/)+1#,($4 a1 #$ '3V#$'8*2 1, #($1'** 1"2 6#(3,6 '912/ 0'8*2 #$ $214
Step 13B
Install Gable Siding continued
Step 14
Install Gable Overhang
D4
>,+'12%WAX%16,%iiHceKf%*,(0%AF_%/'912/$%,(%0'8*24%a($1'**%AF_$%9*)$"%6#1"%1"2%1,-%,9%0'8*2
9/'&24%5$2%DB3%$#(P2/$4
A4
>,+'12%WAX%16,%cBHDe_f%*,(0%AF_%/'912/$%'(3%#($1'**%1,%9#(#$"4%AF_$%6#**%2F12(3%82.,(3%2(3%,9
0'8*24
_4
a($1'**%*'$1%$#3#(0%-'(2*4
30-3/4" Long 2x4
77-3/8" Long 2x4
Do not remove the temporary 1x4 blocks until
the roof trusses and back gable are assembled.