19
9
Position the upper chimney section and fix the upper part to the frame using
the 2 screws removed previously.
10
Similarly, position the lower chimney section and fix the lower part to the frame
using the 2 screws removed previously.
B
8x
(6,4x16x1)
C
4x
(M6)
L
4x
I
4x
(6x70)
O
K
4x
(M6x80)
T1
T2
T3
T4
Y1
2x
(M4x15)
A
4x
(3,5x9,5)
A3
2x
(2,9x9,5)
A2
2x
(2,9x6,5)
B
8x
(6,4x16x1)
C
4x
(M6)
L
4x
I
4x
(6x70)
O
K
4x
(M6x80)
T1
T2
T3
T4
Y1
2x
(M4x15)
A
4x
(3,5x9,5)
A3
2x
(2,9x9,5)
A2
2x
(2,9x6,5)
B
8x
(6,4x16x1)
C
4x
(M6)
L
4x
I
4x
(6x70)
O
K
4x
(M6x80)
T1
T2
T3
T4
Y1
2x
(M4x15)
A
4x
(3,5x9,5)
A3
2x
(2,9x9,5)
A2
2x
(2,9x6,5)
B
8x
(6,4x16x1)
C
4x
(M6)
L
4x
I
4x
(6x70)
O
K
4x
(M6x80)
T1
T2
T3
T4
Y1
2x
(M4x15)
A
4x
(3,5x9,5)
A3
2x
(2,9x9,5)
A2
2x
(2,9x6,5)
Содержание KTI Series
Страница 6: ...6 RANGE HOOD DIMENSIONS 0LQ 0D 0LQ 0D ...
Страница 7: ...7 INSTALLATION HEIGHT REQUIREMENTS MIN 24 OVER ELECTRIC MIN 30 OVER GAS Min 24 Min 30 ...
Страница 28: ...28 WIRING DIAGRAM ...
Страница 34: ...34 DIMENSION DE LA HOTTE 0LQ 0D 0LQ 0D ...
Страница 56: ...56 SCHÉMA DE CÂBLAGE ...
Страница 58: ......
Страница 59: ......
Страница 60: ...991 0658 001_01 210929 D000000008182_00 ...