Technical data • Entire device
Secti
on 2
Te
chn
ica
l da
ta
59
Automation PC 820 User's Manual V 1.20
2.6.8 POWERLINK
Status / Error LED
The status/error LED is a green/red LED.
POWERLINK 1 connection
Cabling
S/STP (Cat5e)
Cable length
max. 100 m (min. Cat5e)
Speed LED
On
Off
Green / red
see Status / Error LED
Link LED
On
Blinking
Yellow
Link
(POWERLINK
network
connection
available)
Activity (blinking)
(Data transfer in
progress)
Table 34: POWERLINK connection
Red - error
Description
On
The POWERLINK interface has encountered an error (failed Ethernet frames, increased number of
collisions on the network, etc.).
Table 35: Status / Error LED as error LED - POWERLINK operating mode
Green - status
Description
Off
NOT_ACTIVE
Managing Node (MN)
The bus is monitored for POWERLINK frames. If a frame is not received within the configured time
window (timeout), the interface goes directly into PRE_OPERATIONAL_1 status (single flash).
If, however, POWERLINK communication is detected before this time passes, the interface goes
directly into the BASIC_ETHERNET status (flickering).
Controlled Node (CN)
The bus is monitored for POWERLINK frames. If a frame is not received within the configured time
window (timeout), the interface goes directly into BASIC_ETHERNET status (flickering).
If, however, POWERLINK communication is detected during this time, the interface goes directly into
the PRE_OPERATIONAL_1 status (single flash).
Green flickering (approx. 10 Hz)
BASIC_ETHERNET
The interface is in BASIC_ETHERNET status, and is operated purely as an Ethernet TCP/IP interface.
Managing Node (MN)
This status can only be changed by resetting the interface.
Controlled Node (CN)
If POWERLINK communication is detected while in this status, the interface goes into the
PRE_OPERATIONAL_1 state (single flash).
Single flash (approx. 1 Hz)
PRE_OPERATIONAL_1
The interface status is PRE_OPERATIONAL_1.
Managing Node (MN)
The MN starts the operation of the "reduced cycle". Collisions are allowed on the bus. There is not yet
any cyclic communication.
Controlled Node (CN)
The CN waits until it receives an SoC frame and then switches to PRE_OPERATIONAL_2 status
(double flash).
Table 36: Status/Error LED as status LED - POWERLINK operating mode
POWERLINK
Содержание 5PC820.SX01-00
Страница 2: ...2 Automation PC 820 User s Manual V 1 20...
Страница 4: ...4 Automation PC 820 User s Manual V 1 20...
Страница 6: ...6 Automation PC 820 User s Manual V 1 20...
Страница 80: ...80 Technical data Individual components Automation PC 820 User s Manual V 1 20...
Страница 108: ...108 Commissioning Known problems issues Automation PC 820 User s Manual V 1 20...
Страница 226: ...226 Standards and certifications International certifications Automation PC 820 User s Manual V 1 20...
Страница 304: ...304 Automation PC 820 User s Manual V 1 20 Figure index...
Страница 310: ...Table index 310 Automation PC 820 User s Manual V 1 20...
Страница 312: ...Model number index 312 Automation PC 820 User s Manual V 1 20 9S0000 01 020 26 193...