The controller is determined for installation in an UP box and may not be exposed to any heat or cold
sources. Furthermore, care must be taken to ensure that the device is not exposed to the influence of
foreign heat or cold sources that warm or cool the device at its back (through air flows in cavity walls
or the temperatures radiated by ascending pipelines, f. ex.). The controller should be mounted on the
wallpaper / the wall covering. The device can be integrated into
corresponding flush switch installation frame systems. If using
multiple frames, the controller needs always to be mounted in
the lowest position.
Caution: Prior to performing any installation works,
always make sure to disconnect the mains voltage at
all poles!
The electrical connection is to be realised as shown in the
connection diagram in section 9 herein. The plug-type terminals
can comfortably be pre-wired for this purpose and connected
to the controller while installing it into the under plaster box. The
opening of the device is realised as described in the drawing
below by holding the housing cover at the top and bottom and
pulling it open.
7. Mounting / connection
When starting the controller up for the first time, the experts menu items 6.2 Language and 6.1,
Controller type are being called up all automatically.
The device is operative only if all entries have been made correctly.
8. First start-up and commissioning