
NITE Plus Installation Procedures
1-9
Freightliner Cascadia rev 10/7/2013
Rollup Floor Mat
Rollup the floor mat from left to right.
You will now be able to see the floor
rivets which will help you determine the
location for the
NITE Plus
unit. Set the
NITE Plus
floor template on the floor
of the center compartment.
Determine Location for
NITE Plus
unit Mounting Plate
Position the provided template 5 ¼ ″ from the front wall (A) and 13 ⅛″
from the left floor seam (B). Note the rivets in the floor – this indicates
where the flooring cross members are located. You can now mark the two
rectangular openings in the template. Check under the truck for any
obstructions before drilling or cutting.
3
4
5
Cut Out Floor Openings
Drill ½″ starter holes in opposing corners
of the two areas marked for cutting. Use air
saw/jigsaw to cut through truck floor.
These two openings will provide condenser
air inlet and exhaust for the
NITE Plus
unit.
NOTE
: Check under the truck for any
obstructions before drilling or cutting.
A
B
Содержание NITE Plus
Страница 18: ...NITE Plus SECTION 2 ELECTRICAL INSTALLATION...
Страница 22: ...Electrical Installation 2 4...
Страница 24: ...Electrical Installation 2 6...
Страница 27: ...NITE Plus SECTION 3 ESPAR HEATER INSTALLATION...
Страница 39: ...NITE Plus SECTION 3 WEBASTO HEATER INSTALLATION INSTALLATION...
Страница 41: ...NITE Plus SECTION 5 CHECKLIST...