
25
6 MAINTENANCE
To maintain maximum functionality and effi-
ciency, and to comply with applicable legi-
slation, have the boiler serviced at regular
intervals.
The frequency at which servicing should be
performed depends on installation and ope-
rating conditions.
The boiler should nevertheless be inspected
by specialist personnel from the manufac-
turer’s Technical Assistance Service at least
once a year.
Always switch the boiler off if any work or
servicing has to be done on other equipment
installed near the flue gas vent pipes and/or
flues and associated accessories.
On completion of work, have the efficiency of
the flue checked by qualified personnel.
b
Switch the boiler off at its control panel
and at the mains power switch, and turn
the gas supply off by closing the gas
shut-off cock before performing any cle-
aning or maintenance on the boiler.
6.1
Scheduled maintenance
Scheduled maintenance normally consists of
the following operations:
- Remove encrustations from the burner.
- Remove encrustations from the heat
exchangers.
- Check and clean the flue pipes.
- Check the efficiency of the external casing.
- Check the ignition, normal functioning and
shutdown of the boiler in DHW and CH
modes.
- Check the tightness of the gas and water
pipe joints.
- Check gas consumption at maximum and
minimum power.
- Check the position of the ignition electrode
and flame detection sensor.
- Check the gas failure safety system.
Do not
use flammable substances (e.g.
petrol, alcohol etc.) to clean the boiler or any
of its parts.
Do not
use paint thinners to clean the casing
or any painted or plastic parts of the boiler.
Use only soapy water to clean the boiler
casing.
6.2
Extraordinary maintenance
Extraordinary maintenance involves actions
designed to restore the functioning of the boi-
ler to its design specifications and to ensure
conformity to legal requirements after a failure
or malfunction.
These actions can be:
- Replacement of parts
- Repairs
- Reconditioning of parts.
These actions generally require special tools
and equipment.
Содержание NOVELLA 24-31 RAI PV
Страница 1: ...NOVELLA 24 31 45 RAI 24 31 RAI PV BOILERS CAST IRON BASE INSTALLATION MANUAL...
Страница 27: ......