INSTALLATION

11

1

2 3 4

5

0

6

F

Ps

Pa

Is

Ia

CN3
CN4

CN6

3

2

1

4 5 6

Psc

Psr

Ua

C

S1

Us

C

Cable duct (not supplied)

Sensor connections

-  Route probe cables through the cable guides (F), the 

fairleads (Ps), the passages on the insulation (Is), the 

solar station outlets (Us/Ua) and connect them to ter-

minal board M4 of solar regulator (terminals S1-S2-

S3-S4) making reference to the instructions provided 

in the specific regulator manual.

Upon  connection,  or  should  it  be  necessary  to  increase 

probe cable length, refer to these remarks:

-  Absolutely avoid laying probe cable together with 

mains power cables and/or AC cables

-  Absolutely avoid routing cables close to strong mag-

netic fields

-  Avoid any cable jointing as much as possible; solder 

and duly insulate any indispensable jointing

-  Use twisted and shielded wires

-  Use cables having a cross-section of over 0.5 mm

2

Solar controller power connections

-  Route the supply cable through the cable guides (F), 

the fairleads (Pa), the passages on the insulation (Ia), 

the solar station outlets (Ua) and connect it to termi-

nal board M1 of solar regulator (terminals L-N-GND) 

making reference to the instructions provided in the 

specific regulator manual.

Once electrical connections are completed, fasten cables 

using the guides supplied, close regulator cover and solar 

station protection housing.

Содержание IDRA DS 200 FI

Страница 1: ...Installation and Operation Manual Solar Solar storage cylinder IDRA DS FI Installation and Operation Manual EN...

Страница 2: ...following symbols are used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This manual Code Rev comprises page...

Страница 3: ...p the product purchase documents to be presented to the B authorised Technical Assis tance Centre to request a service call under warranty b Size the solar expansion tank so as to ensure com plete abs...

Страница 4: ...chieved thanks to Safety valve with trigger pressure set at 6 bar Solar Regulator for circulator management adjust ment It manages 9 system diagrams that can be se lected Refer to the specific manual...

Страница 5: ...urn valve 2 Delivery Valve solar plant delivery with built in non return valve 3 Outlet temperature gauge 4 Return temperature gauge 5 Insulation 6 Solar controller 7 Display 8 Multidirectional joysti...

Страница 6: ...TO INTEGRATION COIL Upper coil continuous efficiency ACS 10 45 C Vbu reference volume Coil delivery temperature 80 C T 20 C 16 1 23 31 4 31 4 kW 400 572 774 774 l h 70 C T 20 C 10 3 17 20 7 20 7 kW 2...

Страница 7: ...t 70 C 374 438 659 863 l 60 C 284 375 531 675 l 50 C 205 310 390 485 l DESCRIPTION SOLAR STATION TECHNICAL DATA Safety valve calibration pressure 6 bar Maximum operating temperature 110 C Power supply...

Страница 8: ...recommended for a correct maintenance and access to the device b When installing the boiler allow sufficient space around it to access all safety and control devices and to permit easy maintenance 11...

Страница 9: ...50 1 33 450 1 33 520 1 33 520 mm DF Flange internal diameter 130 130 130 130 mm A 1120 1420 1270 1570 mm B 171 171 208 207 mm C 403 393 427 443 mm D M8 threaded inserts for grounding point accessory h...

Страница 10: ...mnipolar magneto thermal circuit breaker and a disconnecting switch compliant with the pre vailing standards of the installation country respect the polarity of the L1 Phase N Neutral connections use...

Страница 11: ...together with mains power cables and or AC cables Absolutely avoid routing cables close to strong mag netic fields Avoid any cable jointing as much as possible solder and duly insulate any indispensa...

Страница 12: ...VR counter clockwise Close taps A and B b During system flushing pay attention to water com ing out of the taps as vapour could be released with risk of burns or scalds Use suitable personal protec ti...

Страница 13: ...een eliminated Close the manual bleed valve and any vent valves opened previously Turn handle on valve VR counter clockwise Temporarily raise the pressure in the system to 4 bar Start up the system fo...

Страница 14: ...any wiring and electric devices below to protect them against any leakage of heat transfer fluid Close valves VR and VM by turning handle clock wise by 90 Open taps A and B and drain the solar circui...

Страница 15: ...he product End user 23 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C set the hea...

Страница 16: ...23 A 23900 Lecco LC www berettaboilers com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore...

Отзывы: