background image

12

PUTTING INTO SERVICE

 

b

CAUTION!

 Completely fill the water circuit before 

putting the product into service.

 - Check that the ring nuts of all the water fittings are tight.

 - Fill the system and check it for water tightness.

 - Open the cold water and hot water shut-off valves 

slowly in order to avoid pressure surges.

 - Bleed the system as follows:

 - Open a hot water tap near the product and unscrew 

the thermostat knob as far as it will go.

 - Open the bleed screw on the pump upstream to bleed 

air from the storage cylinder side of the system. Con-

tinue until all the air has been bled from the system.

 - Adjust the thermostat knob to the desired water tem-

perature.

 

b

All fittings are assembled in the factory. It is never-

theless advisable to check their tightness after in-

stalling the product. It is also necessary to test the 

product for water tightness at operating pressure 

when putting it into service.

 

b

Check the expansion vessel regularly in accordan-

ce with applicable standards.

 - Set the pump to function at a constant pressure diffe-

rential. This ensures a constant head within the permit-

ted flow rate range.

 - Fit the insulation.

 - On completion of installation, check the product to en-

sure that it functions correctly and does not leak.

Pos.

t (*C)

1

35

2

40

3

45

DEFAULT SETTING

4

50

5

55

ADJUSTMENT STOP

6

60

7

65

1

2

3

4

5

6

Default setting

Adjustment stop

ELECTRICAL CONNECTIONS

The following instructions are mandatory.

1  Use a multi-pole, magnetic thermal, earth leakage breaker and disconnector that conforms to legislation in the count-

ry of installation.

2  Respect the L (Phase) - N (Neutral) polarity. Keep the ground wire about 2 cm longer than the power wires.

3  Make sure the product is correctly connected to ground.

 

a

It is strictly forbidden to use water pipes to ground the product.

 

a

Do not route the power cable near hot surfaces (like hot water pipes). Use a suitable class of cable if there is any 

possibility of contact with parts at temperatures above 50°C.

 

b

The manufacturer declines all responsibility for damage caused by failing to ground the product adequately or by 

failure to respect the wiring diagrams provided in this manual.

Содержание ACS 35 T

Страница 1: ...ON CONTENTS OF THE KIT GENERAL SAFETY INFORMATION AND PRECAUTIONS READ THIS MANUAL THOROUGHLY BEFORE PERFORMING ANY WORK ON THE PRODUCT The manufacturer reserves the right to modify the product withou...

Страница 2: ...er in accordance with appli cable standards Correct functioning is only guaranteed provided the product is used with the pump for which it is designed The manufacturer cannot be held responsible for t...

Страница 3: ...t return valve 5 Blue knob for cold water inlet valve 6 Black knob for non return valve with DHW outlet temperature sensor 7 Non return valve 8 Three way mixer valve with thermostatic actuator 35 65 C...

Страница 4: ...inimum permissible temperature DHW circuit 2 C Maximum operating temperature 90 C Maximum operating pressure primary circuit 10 bar Opening pressure primary circuit non return valves 28 mbar Opening p...

Страница 5: ...5 C 20 45 C 20 48 C 10 48 C 10 50 C 20 50 C Domestic hot water production graph NB Correct functioning of the product is only guaranteed if the primary circuit inlet temperature is at least 5 C higher...

Страница 6: ...Q m h Q m h P1 W p kPa H m m ax p v Wilo Yonos Para RS 15 6 20 6 25 6 30 6 1 230 V Rp1 2 Rp3 4 Rp1 Rp1 1 4 0 5 1 0 1 5 2 0 2 5 3 0 max 0 0 0 2 0 4 0 6 0 8 0 2 4 6 8 10 0 1 2 3 4 5 6 0 10 20 40 30 50 6...

Страница 7: ...S RP UACS RS 1 M 3 4 F ACS 35 T MP Primary inlet 1 M 3 4 F RP Primary outlet return 1 M 3 4 F EAFS Domestic cold water inlet 1 M 3 4 F UACS DHW outlet 1 M 3 4 F RS Recirculation union 3 4 F Depth mm 2...

Страница 8: ...of the product The product must be installed in conformity to applicable standards by suitably qualified persons employed by a company that assumes full responsibility for the completed installation I...

Страница 9: ...recommended to install the product as near as practical to the storage cylinder in order to avoid unnecessary heat loss from the connecting pipes WALL MOUNTING b b Handle with care Remove the product...

Страница 10: ...e screws 2 through the slots 4 in the back panel using the side guides 5 to align it Slide the product down until the screws lie at the top of the slots Tighten the screws 3 from the front of the prod...

Страница 11: ...ficiency of the water heating system The ACS 20 hot water mixer is made from materials that conform to the requirements of Ministerial Decree 174 2004 Italy implementing Council Directive 98 83 EC All...

Страница 12: ...andards Set the pump to function at a constant pressure diffe rential This ensures a constant head within the permit ted flow rate range Fit the insulation On completion of installation check the prod...

Страница 13: ...the flushing fluid drain to the DHW outlet valve 2b Pump flushing fluid through the heat exchanger until it is clean 1b 2b 2a 1a CHECKS On completion of the installation perform the checks listed in t...

Страница 14: ......

Страница 15: ......

Страница 16: ...Lecco LC www berettaclima it The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liable to mo...

Отзывы: