Installation and Operation Manual

   

Solar  |  solar storage cylinder

IDRA N DS

Installation and Operation Manual

EN

   

Содержание 20086803

Страница 1: ...Installation and Operation Manual Solar solar storage cylinder IDRA N DS Installation and Operation Manual EN...

Страница 2: ...2...

Страница 3: ...following symbols are used in this manual b CAUTION Identifies actions that require caution and adequate preparation a STOP Identifies actions that you MUST NOT do This manual Code Rev comprises pages...

Страница 4: ...acement immediately Keep the product purchase documents to be present ed to the B authorised Technical Assistance Centre to request a service call under warranty b Size the solar expansion tank so as...

Страница 5: ...t 20052790K4LH3800001 Model IDRA N DS 1500 Code 20052790 Serial Number K4LH3800001 Beretta Caldaie Via Risorgimento 13 23900 Lecco LC Italy Capacit nom sanitaria 1449 L 1 8 mq 3 4 mq 1200 L h 2200 L h...

Страница 6: ...Sleeve for electric heating element 1 1 2 Coil water capacity 19 4 28 1 28 4 L Coil heat exchange surface area 3 4 4 6 4 6 m2 Power absorbed by coil 88 120 110 kW Domestic hot water production 2200 29...

Страница 7: ...ders are equipped with ded icated sockets for the storage cylinder TEMPERATURE GAUGE or TEMPERATURE SENSOR b The installer is responsible for making all necessary connections to the boiler and solar c...

Страница 8: ...1 2 F 1 1 4 F Psc1 Diameter length of boiler sensor socket 8 200 mm Psc2 Diameter length of boiler sensor socket 8 200 mm Psr Diameter length of solar controller sensor socket 8 200 mm RE Sleeve for e...

Страница 9: ...it safe MODELS IDRA N DS 2000 B IDRA N DS storage cylinders come in two separate packages The first contains the painted cylinder protected by a plastic bag and supported on a wooden pallet The secon...

Страница 10: ...equipment and use suitable safety devices b Make sure that any lifting equipment is of adequate capacity to lift and move the storage cylinder a Do not dispose of packaging material into the envi ron...

Страница 11: ...storage cylinder from the pallet cut the straps secure the lifting cables to the lifting points on the top of the storage cylinder carefully lift the storage cylinder and position it as re quired 11...

Страница 12: ...npack all the material from the second package Wrap the insulation 3 around the storage cylinder carefully lining up the fittings with the holes on the inside of the insulation Secure the insulation i...

Страница 13: ...orage cylinder is to be installed 14 INSTALLATION IN OLDER SYSTEMS AND SYSTEMS REQUIRING MODERNISATION When installing B IDRA N DS storage cylinders in old systems or systems requiring modernisation a...

Страница 14: ...ake sure that all circuits have been bled Make sure that the boiler and solar collectors con nected to the system shut down correctly when their mains power switches are turned OFF Provided the above...

Страница 15: ...e cylinder after cleaning it a Do not use abrasive products petrol or triethylene INTERNAL CLEANING Removing and checking the magnesium anode Remove the cap 1 cover 2 and the anode insula tor disc 1 2...

Страница 16: ...functioning Check the pump The water temperature from the boiler is too low Check the temperature setting There is air in the primary circuit Bleed the circuit SOLAR COLLECTOR CIRCUIT FAULT CAUSE SOLU...

Страница 17: ...the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C set the heater tem perature control where available to the minimu...

Страница 18: ...END USER 18...

Страница 19: ...END USER 19...

Страница 20: ...23 A 23900 Lecco LC www berettaboilers com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefor...