71
Bentone
!
Not all phases, times, indices, abbreviations and symbols appear in the individual
sequence diagrams or are needed there!
Phase numbers
00
Lockout phase
02
Safety phase
10
Home run
12
Standby (stationary)
22
Fan motor (M) = ON, safety valve (SV) = ON
24
Air damper (LK)
fuel valve (V) – position
30
Prepurging
36
Air damper (LK)
ignition (Z) – position
38
Preignition ignition (Z) = ON
39
Test pressure switch-min (Pmin)
40
Fuel valve (V) = ON
42
Ignition (Z) = OFF
44
Interval 1 (t44)
50
Safety time 2 (TSA2)
52
Interval 2 (t52)
60
Operation 1 (stationary)
62
Operation 2 air damper (LK)
low-fire (KL) – position
70
Afterburn time (t13)
72
Air damper (LK)
Rated load (NL) – position
74
Postpurge time (t8)
78
Postpurge time (t3)
80
Evacuation of test space
81
Atmospheric pressure test
82
Filling of test space
83
Gas pressure test
90
Gas shortage waiting time
Valve proving is performed depending on the parameter settings:
Simultaneously with the prepurge time and/or the afterburn time.
Содержание BG 550i M
Страница 31: ...32 Bentone I I J G G G H 172 615 56 2018 08 10 ...
Страница 63: ...63 Bentone 13 2 Wiring diagram 172 615 84 1 2021 05 19 2 ...
Страница 64: ...64 Bentone 13 3 Wiring diagram RWF 50 3 172 615 84 1 2021 05 19 3 ...
Страница 65: ...65 Bentone 13 4 Wiring diagram RWF 50 2 172 615 84 1 2021 05 19 4 ...
Страница 66: ...66 Bentone 13 5 Wiring diagram Jumo 316 172 615 84 1 2021 05 19 5 ...
Страница 145: ......
Страница 146: ......
Страница 147: ......
Страница 148: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone com ...