27
Bentone
2.
1.
B
A
B
Adjustment of outlet pressure
(setpoint adjustment)
Factory setting: Standard spring p 2
10-30 mbar
1.
1.
Unscrew protective cap A.
2.
Adjustment (+) Setting
spindle B ”Turn counter-
clockwise” = Increasing
outlet pressure (setpoint)
or
2.
Adjustment (-) Setting spindle B ”Turn
clockwise” = Reducing outlet pressure
(setpoint)
4. Check setpoint
5. Screw on protective cap A.
6. Attach lead seal (Page 5).
4.
B
E
C/D
B
A
3.
Replace setting spring
3-4
1.
Remove protective cap. A.
Release spring by turning
adjustment spindle B
counter clockwise. Turn
spindle to stop.
2.
Unscrew complete
adjustment device B and
remove spring C.
3.
Insert new spring D.
4.
Assemble complete
adjustment device and
adjust desired off-set.
5.
Screw on protective cap A.
Stick adhesive label E onto
typeplate.
6.
Attach lead seal.
Содержание BG 400-2 Biogas
Страница 31: ...160303 613 _ _ 31 Bentone 10 3 5 Setting the main flow 1 2 3 Loosen Do not use any force...
Страница 47: ......
Страница 48: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone com...