
39
172 305 25 05-01
1(3)
GENERAL INSTRUCTION
Flame monitoring and measurement of ionisation current
The burner is monitored according to the ionisation principle. Check the
ionisation current on start-up and on each service call.
The reason for a low ionisation current may be leaking currents, bad
connection to earth, dirt or a faulty position of the flame electrode in the
burner head. Sometimes also a faulty gas/air mixture may cause too weak
a ionisation current.
The ionisation current is measured by means of a microampere meter
(µA) connected in series with the flame electrode and the gas burner
control.
Connect the µA-meter, see figure. Min. required ionisation current according
to table. In practice this current must be considerably higher, preferably
more than 10 µA. All the gas burners are equipped with a ionisation cable
that can be slit which facilitates the connection of the µA-device.
Flame monitoring
Gas control
Connection to terminal
Min. ionisation
in gas control
current required
LMG Serie A
1
2 µ A
LMG Serie B
2
10 µA
LGB
1
10 µ A
LFL
24
10 µ A
MMI 810
2
5 µ A
TMG 740-3
1
5 µ A
Содержание BG 300LN
Страница 2: ......
Страница 13: ...14 172 155 05 01 01 EASURES AND CHECKS BEFORE START UP BG300 400LN Gas nozzle assembly Natural gas 4 5 12 14 2...
Страница 29: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone se www bentone com...