o
Cancelled
, the user cancelled the upgrade.
o
Request Pending
,
Request Cancelled
are scheduler internal states and will
automatically progress to
Pending
or
Cancelling
.
11. Navigate to
Progress
to observe active OTA upgrade attempts in progress.
6.7 Reboot Field Devices
Ranger Pro field devices can be rebooted by navigating to the
Network
section and selecting the
device of interest, opening the
Device Reset
accordion, then select from warm restart or restart
as provisioned.
6.8 Harden the System
The security risk to your network when using Ranger Pro Gateways is like that of any distributed
control system or industrial control system. You need to take all reasonable steps to properly
secure these devices.
At a minimum, to secure Ranger Pro Gateways:
l
Install on secure networks due to unencrypted communications.
l
Use unique, strong passwords for all devices.
l
Provide adequate phyical security to prevent unathorized access.
l
Verify that the latest software is installed on all devices.
The gateway only has one user role. To prevent unauthorized changes, limit access to systems
connected to the gateway.
46/46
Ranger Pro ISA100 Wireless Gateway
User Guide
158M1430 Rev. -