background image

1701ULTRA(EC)GBEN, p. 4/29 

2.2

 

GENERAL

 

 

 

The

 

instructions

 

in

 

this

 

manual

 

apply

 

to

 

the

 

condensing

 

gas

fired

 

air

 

heater

 

model

 

ULTRA/ULTRA

 

EC.

 

All

 

models

 

and

 

sizes

 

are

 

available

 

for

 

use

 

with

 

either

 

natural,

 

propane

 

or

 

butane

 

gas

 

within

 

operating

 

temperatures

 

between

 ‐

15°C

 

and

 

40°C.

  

 

These

 

heaters

 

are

 

designed

 

for

 

use

 

in

 

domestic,

 

industrial

 

and

 

commercial

 

premises,

 

suitable

 

only

 

for

 

indoor

 

installation

 

 

The

 

type

 

of

 

gas,

 

the

 

input

 

rate

 

and

 

the

 

electrical

 

supply

 

requirements

 

are

 

shown

 

on

 

the

 

heater

 

rating

 

plate.

 

 

The

 

instructions

 

are

 

only

 

valid

 

for

 

the

 

country

 

of

 

use

 

indicated

 

on

 

the

 

appliance.

 

If

 

not

 

correct

 

contact

 

your

 

supplier.

 

 

Installation

 

should

 

be

 

done

 

by

 

a

 

suitably

 

qualified

 

installer

 

in

 

accordance

 

with

 

these

 

instructions

 

and

 

with

 

all

 

rules

 

in

 

force.

 

 

The

 

installation

 

manual

 

is

 

shipped

 

with

 

the

 

heater.

 

Verify

 

that

 

the

 

literature

 

is

 

correct

 

for

 

the

 

heater

 

being

 

installed.

 

If

 

the

 

manual

 

is

 

incorrect

 

for

 

the

 

heater,

 

contact

 

the

 

supplier

 

before

 

beginning

 

installation.

 

 

Ensure

 

the

 

environment

 

in

 

which

 

the

 

air

 

heater

 

will

 

be

 

installed

 

will

 

not

 

create

 

a

 

hazard

 

i.e.

 

where

 

excessive

 

dust,

 

flammable

 

or

 

corrosive

 

substances

 

and/or

 

vapours

 

and

 

combustible

 

materials

 

may

 

be

 

present.

 

 
 
 

2.3

 

WARRANTY

 

 

 

  

Warranty

 

is

 

void

 

if

:

 

 

 

 

Heaters

 

are

 

used

 

in

 

atmospheres

 

containing

 

flammable

 

vapours

 

or

 

atmospheres

 

containing

 

chlorinated

 

or

 

halogenated

 

hydrocarbons

 

or

 

any

 

contaminant

 

(silicone,

 

aluminium

 

oxide,

 

etc.

 

...).

 

 

The

 

installation

 

is

 

not

 

in

 

accordance

 

with

 

these

 

instructions.

 

 

Wiring

 

is

 

not

 

in

 

accordance

 

with

 

the

 

diagram

 

furnished

 

with

 

the

 

heater.

 

 

Unit

 

is

 

installed

 

without

 

proper

 

clearance

 

to

 

combustible

 

materials

 

or

 

without

 

proper

 

ventilation

 

and

 

air

 

for

 

combustion.

 

 

Air

 

throughput

 

is

 

not

 

adjusted

 

within

 

the

 

range

 

specified

 

on

 

the

 

rating

 

plate.

  

 

 
 

2.4

 

UNCRATING

 

&

 

PREPARATION

 

 

 

The

 

unit

 

was

 

test

 

operated

 

and

 

inspected

 

at

 

the

 

factory

 

prior

 

to

 

crating

 

and

 

was

 

in

 

proper

 

operating

 

condition.

 

If

 

the

 

heater

 

has

 

incurred

 

damage

 

in

 

shipment,

 

document

 

the

 

damage

 

with

 

the

 

transport

 

company

 

and

 

contact

 

your

 

supplier.

 

Before

 

installation

 

check

 

that

 

the

 

appliance

 

as

 

described

 

on

 

the

 

packaging

 

label

 

is

 

in

 

accordance

 

with

 

the

 

correct

 

type

 

and

 

model

 

as

 

specified

 

on

 

the

 

data

 

plate

 

and

 

complies

 

with

 

your

 

customer

 

order.

 

After

 

unpacking

 

the

 

appliance,

 

leave

 

it

 

fastened

 

to

 

any

 

base

 

packing

 

for

 

transportation

 

until

 

it

 

has

 

been

 

suspended

 

or

 

until

 

just

 

before

 

base

 

mounting.

 

This

 

affords

 

protection

 

to

 

the

 

underside.

 

 

Check

 

the

 

rating

 

plate

 

to

 

determine

 

if

 

the

 

heater

 

is

 

appropriate

 

for

 

the

 

intended

 

installation.

 

 

Read

 

the

 

manual

 

thoroughly

 

and

 

become

 

familiar

 

with

 

the

 

installation

 

requirements

 

of

 

your

 

heater.

 

If

 

you

 

do

 

not

 

have

 

knowledge

 

of

 

local

 

requirements,

 

check

 

with

 

the

 

gas

 

supplier

 

and

 

any

 

other

 

local

 

agencies

 

that

 

might

 

have

 

requirements

 

concerning

 

this

 

installation.

 

 

Before

 

beginning

 

make

 

preparations

 

for

 

necessary

 

supplies,

 

tools

 

and

 

manpower.

 

If

 

the

 

installation

 

includes

 

optional

 

parts,

 

install

 

these

 

options

 

before

 

the

 

heater

 

is

 

suspended.

 

Follow

 

the

 

instructions

 

included

 

in

 

the

 

option

 

package.

 

 
 

Содержание ULTRA 025(EC)

Страница 1: ...EC This appliance meets the following EC Directives DIR 2009 142 EC GAD DIR 2014 30 EU EMC DIR 2014 35 EU LVD DIR 2006 42 EC MD INSTALLATION COMMISSIONING SERVICING USER INSTRUCTIONS ATTENTION The man...

Страница 2: ...connection Gas supply 17 10 Electrical connections 19 11 Commissioning lighting operation 21 12 Maintenance 23 13 Fault finding 25 14 Spare parts list 27 15 User instructions 27 16 Declaration of conf...

Страница 3: ...owledge unless they have been given supervision or instructions concerning use of the appliance by a person responsible for their safety Children should be supervised to ensure that they do not play w...

Страница 4: ...etc The installation is not in accordance with these instructions Wiring is not in accordance with the diagram furnished with the heater Unit is installed without proper clearance to combustible mater...

Страница 5: ...harge air along exposed walls with extra units provided to discharge air towards the centre of the area For optimum results heaters are best used in conjunction with recirculating air fans suspended a...

Страница 6: ...Protection grade IP Revolutions per minute main fan rpm 950 1260 1340 820 1400 CE Approval number PIN 1 2 G 3 4 G I2H or I3P B22p C12 C32 C42 C52 C62 C82 Max thermal efficiency at max heat input G20...

Страница 7: ...ctrical connections 2 Flue connection D 5 Service panel 3 External gas connection C 6 Condensate drain ULTRA ULTRA EC A B C D E F I J K L M 025 738 1217 1 2 G 80 82 405 55 449 135 311 120 035 738 1217...

Страница 8: ...p 8 29 Figure 1b ULTRA ULTRA EC 100 all dimensions in mm tolerance 3mm 1 Combustion air inlet 100mm 4 Electrical connections 2 Flue connection 100mm 5 Service panel 3 External gas connection 3 4 G 6...

Страница 9: ...100 100 100 820 100 500 100 100 100 820 Heaters can be mounted on suitable non combustible supports 5 INTERNAL LAYOUT Figure 3 1 Metal mesh burner 2 Zero pressure regulator 3 Venturi 4 Differential p...

Страница 10: ...t suspension All points must be used Threaded nut inserts are provided on each side of the top of the heater See figure 4 After suspension the air heater should be rigid so as to avoid placing a strai...

Страница 11: ...n cause unsafe conditions and or create condensation The units may be installed as a balanced flue type C heater requiring both a combustion air inlet pipe and a flue pipe or as a power vented heater...

Страница 12: ...all other relevant regulations rules in force Single wall flue pipe seamless aluminium stainless steel pipes are required All joints must be sealed to prevent products of combustion from leaking into...

Страница 13: ...1701ULTRA EC GBEN p 13 29 Figure 7 Type C appliances combustion air and flue pipe sockets VERTICAL FLUE KIT OPTION 302 HORIZONTAL FLUE KIT OPTION 301...

Страница 14: ...lation improved vapour barriers and weather proofing These practices mean that buildings are sealed much tighter than in the past Model ULTRA ULTRA EC 025 035 050 075 100 Max straight concentric lengt...

Страница 15: ...nt condensation water dripping from the drain pipe If you want to open the siphon e g to clean it the air heater must be shut down For security reasons it is recommended to wear gloves when cleaning t...

Страница 16: ...ater a gas tap with coupling must be mounted for servicing see figure 11 It is strongly recommended to place a gas filter and clean the gas tube with nitrogen The whole of the gas service installation...

Страница 17: ...the venturi Throttle adjustments and CO2 measurements will have to be made in order to obtain the recommended CO2 value For details please see the CO2 Throttle adjustment section 9 3 Attention Always...

Страница 18: ...n make connections to the terminals in the electric box as indicated on the wiring diagram Ensure that all cables and installers wiring are appropriately fixed and that they do not touch the flue comb...

Страница 19: ...idual on off control 0 or 100 functioning 2 By means of option 952 weekly programming digital chronothermostat GA11 used for remote control of several units consult option 952 instruction for more det...

Страница 20: ...shed during a run cycle an automatic attempt for re ignition will take place If the burner does not relight safety shut down and lockout will occur Manual intervention to reset will be necessary to pu...

Страница 21: ...uring which the combustion fan operates prior to activation of the ignition device The safety time is the delay between the gas valve being energised and the flame sensor checking for the presence of...

Страница 22: ...ve all the dust from the combustion air fan with a soft cloth or brush 11 Check that the motor and the turbine are undamaged 12 Replace all parts in reverse order Substitution of bulb thermostat LC3 1...

Страница 23: ...nel see removal of the service panel 4 Disconnect the electrical connections of the air circulation fan These connections are on the electrical connections terminal see the wiring diagram 5 Loosen the...

Страница 24: ...the unit is grounded earthed YES Connect ground wire to unit chassis Replace flame sensor Replace control module YES YES In case of a LL net swap the 2 lines NO Check if the igniter sparks Check prese...

Страница 25: ...rameters YES Replace Pressure switch NO Check copper pipe inside the unit is not clogged Replace copper tube Check if the cooling fan works within set parameters NO Replace cooling fan NO Check if the...

Страница 26: ...RZ29 035 100 reset switch 60 61988 2645 all signal lamp 60 61997 all pressostat 30 60621 13 605 all venturi gas valve 03 25700 003 0 0 3 025 venturi gas valve 40cm tube 03 25700 051 0 51 035 venturi g...

Страница 27: ...set by pushing reset button inside the appliance or the remote control b check if thermal overheat control requires resetting 7 If the thermal overheat control requires resetting and doing so restarts...

Страница 28: ...1701ULTRA EC GBEN p 28 29 16 DECLARATION OF CONFORMITY...

Страница 29: ...mbiradsales nortek com www ambirad co uk Registered in England N 1390934 Registered office 10 Norwich Street London EC4A 18D Nortek Global HVAC is a registered trademark of Nortek Global HVAC Limited...

Отзывы: