background image

                                                                                   

Last revised:    May 17, 2013                                                                                                                               

3.4 Zep Components 

 

ZE

ZE

ZE

ZEP GROOVE AND ROCKIT

P GROOVE AND ROCKIT

P GROOVE AND ROCKIT

P GROOVE AND ROCKIT    

The Rockit is a hardware feature which used to secure PV modules to the roof attachments. 

The Rockit fits into the Zep Groove on both sides: The Key side insets, while the Tongue 

side receives. 

 

 

Figure 

Figure 

Figure 

Figure 3

33

3----5

55

5: Zep Groove and Rockit

: Zep Groove and Rockit

: Zep Groove and Rockit

: Zep Groove and Rockit    

 

KEY AND TONGUE

KEY AND TONGUE

KEY AND TONGUE

KEY AND TONGUE    

The Key and Tongue concept informs all Zep Compatible designs. The Key side inserts into 

the Zep Groove, similar to inserting a key into a lock. On the other side, the Zep Groove 

allows PV modules to “drop in” easily onto the Tongue side. 

 

 

Figure 

Figure 

Figure 

Figure 3

33

3----6

66

6: Module Drop

: Module Drop

: Module Drop

: Module Drop----In Example

In Example

In Example

In Example    

 

 

Содержание PM245P01 Series

Страница 1: ...c c M Mo od du ul le es s I In ns st ta al ll la at ti io on n G Gu ui id de e E ET TL L PM245P01 Series V V V Version 1 0 ersion 1 0 ersion 1 0 ersion 1 0 Note The content of this manual is subject t...

Страница 2: ...Chapter 2 Electrical Characteristics of PV Module 4 2 1 Performance of PV Modules 4 Chapter 3 Installation 5 3 1 Choose a Suitable Location 5 3 2 General Installation Guidelines 5 3 3 Mounting Options...

Страница 3: ...DWARE IS ATTACHED TO GROVE IN MODULE FRAME ATTACHED TO GROVE IN MODULE FRAME ATTACHED TO GROVE IN MODULE FRAME ATTACHED TO GROVE IN MODULE FRAME 1 2 Product Certifications and UL Listing Information T...

Страница 4: ...t module performance Do not stand on drop scratch or allow objects to hit modules especially module glass Do not install or handle the modules when wet or during periods of high wind Do not install th...

Страница 5: ...in the module Do not attempt to change or repair any part of the module Damaged modules broken glass torn back sheet broken j boxes broken connectors etc can present electrical hazards as well as lace...

Страница 6: ...Output Module Output Module Output Module Output A PV module may produce more current and or voltage than reported at STC Sunny cool weather and reflection from snow or water can increase current and...

Страница 7: ...structure and ground is required to prevent wiring damage and allows air to circulate behind the module Traditional mounting systems require a gap between two modules that has a minimum 20mm for comm...

Страница 8: ...n hardware are rated for design loads of 50 psf 2400 Pa on the back surface e g wind load and on the front surface e g wind and snow load when installed according to the following diagrams and with al...

Страница 9: ...itional holes doing so will void the warranty Use appropriate corrosion proof fastening materials For PM245P01 modules four stainless steel bolts with nuts washers and lock washers are recommended per...

Страница 10: ...ide frames of clamping should touch longer sides of the module to ensure tight connection between frame and clamping Figure 3 4 shows module mounting areas The centerline of the clips should be betwee...

Страница 11: ...gure Figure 3 3 3 3 5 5 5 5 Zep Groove and Rockit Zep Groove and Rockit Zep Groove and Rockit Zep Groove and Rockit KEY AND TONGUE KEY AND TONGUE KEY AND TONGUE KEY AND TONGUE The Key and Tongue conce...

Страница 12: ...N TION TION The Interlock provides module to module frame bonding through the interface with the Zep Groove The Interlock is UL Listed to UL2703 and ETL Listed to UL2703 Use the marks along the top ed...

Страница 13: ...3 Do not over or under tighten Figure Figure Figure Figure 3 3 3 3 9 9 9 9 Interlock Insertion and Installation Uses ZepTool Interlock Insertion and Installation Uses ZepTool Interlock Insertion and...

Страница 14: ...a Ground Zep in the Zep Groove of any module around the array perimeter Start with the set screw at 9 o clock position pointing left 2 Use either the Zep Tool or the Flat Tool shown below to lock the...

Страница 15: ...IS MADE SINCE SINCE SINCE SINCE THE FRAME IS FULLY THE FRAME IS FULLY THE FRAME IS FULLY THE FRAME IS FULLY INSULATED BY ANODIZI INSULATED BY ANODIZI INSULATED BY ANODIZI INSULATED BY ANODIZING NG NG...

Страница 16: ...rect exit of the cable screw joint A minimum bending radius r 4x static steady r 5x dynamic cable diameter must be maintained The cable must be routed in a way that tensile stress on the conductor or...

Страница 17: ...xposure to sunlight 4 3 Limitation of Connection ETL The UL 1703 certificate of these modules guarantees their insulation up to a DC voltage of 1000 V UL 1703 Standard However a cable with a suitable...

Страница 18: ...s cross linked insulated polyethylene and coated with polyvinyl chloride or similar insulation The insulation should be flame acid and alkali resistant and should be stored in an area free of any corr...

Страница 19: ...all with suitable protection to redirect a discharge of 30 or more direct current volts to if delivered any person on the installation team Please prevent adherent of oil such as paraffin liquid anima...

Страница 20: ...odule Cleaning Guidelines Dirt piled up on the module s transparent surface reduces its performance and may cause the module hot spot effect This problem may become serious in the case of industrial w...

Страница 21: ...abrasive cloth seamless cloth 1 Clean module and glass surface with solution and tool described as above 2 If dirty area on glass surface which is hard to be cleaned such as oily substances try to use...

Страница 22: ...g layer during installation or transport 5 5 Inspecting connections and cabling While performing preventive maintenance every 6 months carrying out the following operations Check the tightness and con...

Отзывы: