background image

                                                                                   

2013/7/25

                                                                   

8

 

Chapter 3 

Chapter 3 

Chapter 3 

Chapter 3 Mo

Mo

Mo

Mounting

unting

unting

unting Guidelines

 Guidelines

 Guidelines

 Guidelines

 

 

Modules  may  be  mounted  at  any  angle  from  horizontal  to  vertical.  Select  the  appropriate 
orientation to maximize sunlight exposure.   
 
A  gap  between  the  module  and  system  structure  or  ground  is  required  to  prevent  wire 
damage and to allow air to circulate behind the module. 
 
Take  care  to  follow  all  applicable  regulations,  especially  municipal  and  fire  codes,  when 
planning  and  executing  your  installation.  Do  not  remove  or  alter  the  module  frame. 
Additional mounting holes may damage the module and reduce the strength of the frame. 

 

 

IMPORTANT

IMPORTANT

IMPORTANT

IMPORTANT

 

Modules should

Modules should

Modules should

Modules should    only 

only 

only 

only be mounted u

be mounted u

be mounted u

be mounted using

sing

sing

sing one of

 one of

 one of

 one of the following methods

 the following methods

 the following methods

 the following methods....    Deviating from the 

    Deviating from the 

    Deviating from the 

    Deviating from the 

mounting instructions below 

mounting instructions below 

mounting instructions below 

mounting instructions below could

could

could

could affect max wind load and/or product warranty.

 affect max wind load and/or product warranty.

 affect max wind load and/or product warranty.

 affect max wind load and/or product warranty.    

    

3.1 Mounting with Screws 

 

Secure the module to the structure using only the factory drilled mounting holes. 

 

Do not drill any additional holes in module frame (doing so would void the warranty).   

 

Use corrosion-proof fastening materials.   

 

A torque wrench must be used for assembly. In the examples shown, the tightening 

torque must be 20N

m.   

 

Refer to product datasheet for the module dimensions and mounting hole locations. 

 

PM200M00 / PM245P00 / PM250M01 / PM300P00

PM200M00 / PM245P00 / PM250M01 / PM300P00

PM200M00 / PM245P00 / PM250M01 / PM300P00

PM200M00 / PM245P00 / PM250M01 / PM300P00    

Secure the modules to the structure using four stainless steel bolts, with nuts, washers, and 

lock washers. Only the existing mounting holes (Diameter: 9mm

9mm

9mm

9mm) that can be used for module 

to  meet  5400Pa  design  strength  under  IEC  61215/  IEC  61730  and  to  meet  2400Pa  design 

strength under UL 1703. 

 

PM318B00

PM318B00

PM318B00

PM318B00    ////    PM318B01

PM318B01

PM318B01

PM318B01    ////    PM096B00

PM096B00

PM096B00

PM096B00    

Secure  the  module  to  the  structure  using  four  M6  (¼”)

M6  (¼”)

M6  (¼”)

M6  (¼”)  stainless  steel  bolts,  with  nuts, 

washers, and lock washers per module. Only the mounting holes that are 322mm from the 

short end of the module can be used for the module to meet 5400 Pa design strength. 

 

Содержание PM096B00

Страница 1: ...In ns st ta al ll la at ti io on n G Gu ui id de e I IE EC C E ET TL L PM200M00 PM245P00 PM250M01 PM300P00 PM318B00 PM318B01 PM096B00 Version 1 Version 1 Version 1 Version 1 1 1 1 1 Note The content...

Страница 2: ...lar Module Specifications 5 2 1 PM200M00 Series 5 2 2 PM245P00 Series 5 2 3 PM250M01 Series 6 2 4 PM300P00 Series 6 2 5 PM318B00 PM318B01 PM096B00 Series 6 2 6 Performance of PV Modules 7 Chapter 3 Mo...

Страница 3: ...b AND observe industry b AND observe industry best est est est p p p practices ractices ractices ractices may may may may result in result in result in result in dangerous conditions and could dangero...

Страница 4: ...affect module performance Do not stand on drop scratch or allow objects to hit modules especially module glass Do not install or handle the modules when wet or during periods of high wind Do not insta...

Страница 5: ...module Do not attempt to change or repair any part of the module Damaged modules broken glass torn back sheet broken j boxes broken connectors etc can present electrical hazards as well as laceration...

Страница 6: ...x 38 70 x 1 57 in Module Weight Module Weight Module Weight Module Weight 15 4 kg 33 5 lbs ModuleType Pmax W Voc V Isc A Vmp V Imp A PM200M00_190 190 30 2 8 60 23 6 8 06 PM200M00_195 195 30 3 8 68 23...

Страница 7: ...983 x 50 mm 77 01 x 38 70 x 1 96 in Module Weight Module Weight Module Weight Module Weight 28 kg 61 73 lbs ModuleType Pmax W Voc V Isc A Vmp V Imp A PM300P00_290 290 44 9 8 69 35 6 8 15 PM300P00_295...

Страница 8: ...determining component voltage ratings conductor capacities fuse sizes and size of controls connected to PV output An additional 1 25 multiplier may be required by the NEC for sizing fuses and conduct...

Страница 9: ...x wind load and or product warranty affect max wind load and or product warranty affect max wind load and or product warranty affect max wind load and or product warranty 3 1 Mounting with Screws Secu...

Страница 10: ...of the mounting clamp to the edge of the module frame Clips and clamps are not provided by BenQ Solar There are two clamping methods available see below for specific measurements o Clamp on the long s...

Страница 11: ...D4 D4 D4 D4 298 298 298 298 mm mm mm mm 11 73 in 11 73 in 11 73 in 11 73 in from the closest long side of the module PM PM PM PM3 3 3 300 00 00 00P P P P00 00 00 00 Module Clamp Location Details Modu...

Страница 12: ...ble Pay attention to the following when wiring 1 1 1 1 Correct wiring scheme Correct wiring scheme Correct wiring scheme Correct wiring scheme Check that the wiring is correct before commissioning the...

Страница 13: ...to where they are ordered Should they be supplied without cables it is recommended that cables with cross sections between 4 and 10 mm2 be used The cables which allow easy handling while providing hig...

Страница 14: ...izing from the surface of the grounding holes or scratch off the anodizing before the grounding connection is made since the frame is fully insulated by anodizing An anti oxidation compound should be...

Страница 15: ...lamps that penetrate the anodization in conjunction with grounding of the mounting system or through direct grounding of the frames by attaching a copper wire to a grounding hole of each module bolt s...

Страница 16: ...xes can be used to enable greater cable cross section area for long distance transmission The modules are qualified for the application class A Hazardous voltage IEC 61730 higher than 50V EN 61730 hig...

Страница 17: ...ppings collecting on the module surface Thin layers of dust normal soiling that reduce the sun s intensity evenly are not dangerous and the power reduction is not as significant as other debris Clean...

Страница 18: ...es include an anodic oxide coating to increase produce life The cleaning cycle for regular anodic oxide coatings is generally every six months When cleaning be sure not to damage or scratch this coati...

Страница 19: ...f the connection cable junctions Check the junction box sealing Should sealing faults be observed the items which have been affected should be replaced and cleaned Contact BenQ Solar for additional in...

Страница 20: ...product meets or exceeds the requirements set forth by UL1703 for PV Modules This UL1703 Standard covers flat plate PV modules intended for installation on buildings and those intended to be freestan...

Отзывы: