23
vibration should be done first.
Un-package Vibration
(Non-operating)
Sine-wave, 5~200Hz, 1.5G, all primary axis, one sweep (5 minutes)
per orientation, total of 15 min.
Un-package Shock
(Non-operating)
Waveform: Half sine
Faces: 6 sides/per orientation, 3 shocks
Duration: < 20 ms
Velocity accelerate: 50 G
Bench Drop
1. Pivot, 90 degree, sitting on right and left side, 1 drop per
orientation, total of 2 drops.
2. Bottom and opposite, 1 drop per orientation, drop height 5 cm,
totally 2 drops.
Security Lock
150N break away force
B2.2 Atmospherics Test
Temperature/Humidity,
(Operating)
Test condition: 0 ~ 40 , 10%~90%, no condensation
℃
℃
Test procedure:
25 /90%, 2hrs 40 /90%, 6hrs 0 , 6hrs
℃
→
℃
→ ℃
→
40 /10%, 6hrs 25 /90%, 2hrs; (2 Cy
℃
→
℃
cles)
Storage High Temperature /
Humidity
(Non-operating, with package)
Test condition: (-20°C ~ 60°C, 10% ~ 90% R.H.)
1. Storage high temperature / humidity exposure test:
25 /60%, 1hrs 60 /90%, 24hrs 25 /60%, 1hrs
℃
→
℃
→
℃
2. Storage transportation test:
25 /60%, 1hrs
℃
→
-20 , 24hrs 25 /60%, 1hrs
℃
→
℃
→
60 /90%, 24hrs 25 /60%, 1 hrs
℃
→
℃
Criteria Inspection:
1. The products should be operated normally at specified lower and
higher temperature environment.
2. The carton no crash and broken issue.
Altitude
Operating:
Without high altitude mode 0°C~35°C @ 0~1499m above sea level
With high altitude mode 0°C~30°C @ 1500~3000m above sea level
Non-operating:
Содержание Mainstream MP611
Страница 20: ...20 Chart 1 Example of Pixel Testing Pattern 60 screen size Please contact BenQ RD for file with correct size ...
Страница 32: ...32 Figure 1 Major Blemish Two Zone Screen Non Critical Zone Critical Zone center 25 ...
Страница 43: ...43 Packing ...
Страница 44: ...44 ...
Страница 61: ...61 Disassembly Assembly Exploded View ...
Страница 62: ...62 ...
Страница 63: ...63 ...
Страница 64: ...64 Disassembly Assembly ...
Страница 65: ...65 ...
Страница 66: ...66 ...
Страница 67: ...67 ...
Страница 68: ...68 Level 1 Cosmetic Appearance Alignment Service Appearance ...
Страница 69: ...69 ...
Страница 70: ...70 ...
Страница 71: ...71 ...
Страница 78: ...78 Overfill adjustment As the picture below adjust light pipe to keep overfill image center ...
Страница 84: ...84 ...
Страница 90: ...90 Figure 4 6 Figure 4 9 ...
Страница 91: ...91 ...
Страница 92: ...92 ...
Страница 94: ...94 ٛ V To check and make sure CLIP of CM hook the HSG ILL very Well Fig 5 5 Fig 5 1 Fig 5 2 Fig 5 3 Fig 5 4 ...
Страница 99: ...99 BKT Link Lamp Shield CW Figure9 3 Figure9 4 ...
Страница 104: ...104 3 Example ...
Страница 105: ...105 10 Mechanical Assembly Concerns ...
Страница 112: ...112 ...
Страница 113: ...113 11 Power Assembly Concerns 1 Power board component add GP glue 1 1 CY604 CY605 add glue ...
Страница 114: ...114 1 2 CY625 CY612 add glue ...
Страница 115: ...115 ...
Страница 116: ...116 1 3 C651 R651 add glue 2 SW2 solder by operator ...
Страница 120: ...120 3 640MHZ 3 Add a Gasket on the lamp box 4 720MHZ 4 Add a Gasket on the DMD Board to Engine ...
Страница 121: ...121 ...
Страница 122: ...122 ...
Страница 124: ...124 ...
Страница 128: ...128 Chapter 3 Power Supply Trouble Shooting Guide 1 2 ...
Страница 142: ...142 Bridge converts the AC input into DC output and the CAP is AC filter ...
Страница 149: ...149 Circuit Schematics ...
Страница 150: ...150 ...
Страница 151: ...151 ...
Страница 152: ...152 PCB Artwork ...
Страница 153: ...153 ...
Страница 154: ...154 ...
Страница 155: ...155 ...
Страница 156: ...156 ...
Страница 157: ...157 ...
Страница 158: ...158 ...
Страница 159: ...159 ...
Страница 160: ...160 ...
Страница 162: ...162 Appendix 2 Code List IR RS232 1 IR Code CUSTOMER CODE DATA CODE FUNCTION 2 RS232 command format 1 ...
Страница 168: ...168 ...