-
45
-
5.2.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipments, materials as bellow:
1) Press-fixture
2) working table
3) Screw-driver
4) knife*1
5) glove
6) cleaning cloth
7) ESD protection
ite
m
picture Operation
Tool
Notes
1
Put panel on the
cushion carefully,
2
Fetch I/F board and
LVDS FFC ,insert FFC
into I/F .
3
Fetch power board and
put it into BKT, and put
the connector wire into
I/F connector ,then put
I/F into BKT (like the
pic. Showed )
Содержание G2420HD
Страница 10: ...10 3 1 2 6 Support Timings...
Страница 51: ...51 5 4 Packing...
Страница 56: ...56 5 6 4 2 AC DC converter...
Страница 58: ...58 5 7 Circuit Operation Theory A 1 Interface board diagram A 2 Circuit operation theory a Monitor Diagram...
Страница 72: ...72 Appendix 2 Physical Dimension Front View and Side view Fig 1 Physical Dimension Front View and Side view...
Страница 73: ...73 Fig 2 Appearance Description...