NOTE:  All piping must be clean of foreign debris, 

such as: oil, grease and shavings.  All 
connections must be tight to prevent 
leaks. 

 

2.  Swing joints or flex pipe must be used at the ends 

of the horizontal pipe between the dispenser and 
the tank.  See Figure 4.  These joints prevent 
leaks which might develop through ground 
movement from settling of the tank, frost heaving 
of the ground or pump island settling.  The joint 
under the dispenser also aids proper alignment of 
the product union or coupling. 

  

Self-Contained 

 

1.  Dig a trench between the tanks and the dispenser 

foundation.  It must be deep enough to place the 
product pipe at least 18 inches below the surface 
of the ground (at its highest point).  The slope 
upwards from the tank should be 1-1/2” to 2” per 
10 feet.  The trench should be as straight as 
possible to avoid as many elbows and bends in 
the line as possible.  All piping must conform to 
local fire regulations. 

 
2.  Use new 1-1/2” or larger EPA approved pipe. 

 
3.  Static lift on self-contained units should not exceed 

10 feet (vertical distance between product level in 
the storage tank and the center of the pumping unit 
rotor. 

 
4. Install an in line vertical check valve underneath 

the dispenser. 

 
5.  Avoid asphalt drive surfaces covering the product 

pipes.  Asphalt increases heat absorption causing 
vapor lock. 

Figure 4 

NOTE:  Make sure the installation conforms to the new EPA regulations for underground storage tanks. 

 
6. Only one self-contained dispenser is permitted 

for each product pipe.  Do not use a tee to 
connect two pumps to one product pipe. 

 

 

NOTE:  

For information and requirements on 

above-ground tank installations with Bennett  
self-contained dispensers, see page 4A. 
 

 

Remote 

 

Install an approved emergency shear valve, designed 
to close automatically in the event of severe impact 
or fire exposure, in the dispenser supply line at the 
base of the dispenser.  The valve will also permit 
safe inspection and maintenance.  Follow the 
installation instructions for the valve being installed.  
See Figure 5.   

Figure 5 

Содержание Horizon 2200 Series

Страница 1: ...tion and operation of this equipment Read and understand this book before applying power Keep this book and tell all service personnel to read this book If you do not follow the instructions you can c...

Страница 2: ...o Calibrate the SB 100 Meter 28 Specification Sheets 29 Warranty Registration Card 30 Bennett Warranty Inside Back Cover NOTICE This equipment generates and uses radio frequency energy If not installe...

Страница 3: ...mpletely assembled WARNING When anchoring the dispenser always level the dispenser with shims before bolting to the island DO NOT shim just the middle of the dispenser and bolt down CAUTION Do not dri...

Страница 4: ...dispensers shown in this book can be operated in the Stand Alone mode no control console The 2200 Series is available with 1 or 2 Products Self contained or Remote dispenser It is also available in a...

Страница 5: ...or self contained dispensers the horizontal section of pipe from the underground storage tank should be at least 18 inches below the surface at its highest point If not extreme temperatures will conve...

Страница 6: ...cal fire regulations 2 Use new 1 1 2 or larger EPA approved pipe 3 Static lift on self contained units should not exceed 10 feet vertical distance between product level in the storage tank and the cen...

Страница 7: ...designed for under the pump mounting is installed for each pumping unit according to the valve manufacturer s instructions x Any additional valves suggested by the Pressure Regulating Valve manufactur...

Страница 8: ...101073 Rev B 3 99...

Страница 9: ...in your area Rigid metal conduit is recommended 6 Use only stranded wire with listed gas and oil resistant insulation Do not use wire smaller than listed on the wiring diagrams 7 DO NOT USE WIRE NUTS...

Страница 10: ...101073 Rev B 3 99 Figure 6 2200 Series Remote 6...

Страница 11: ...101073 Rev B 3 99 Figure 7 2200 Series Self Contained 7...

Страница 12: ...101073 Rev B 3 99 8 Figure 8 HOW TO TRANSPORT THE 2200 SERIES PREFERRED METHOD FOR HIGH HOSE...

Страница 13: ...101073 Rev B 3 99 9 Figure 9 PREFERRED METHOD FOR LOW HOSE...

Страница 14: ...ircuit breaker 2 Do not connect any other devices to these circuits 3 Each remote dispenser uses one 120V 50 60 Hz or 240V 50 60Hz circuit for dispenser power Put no more than four Horizon dispensers...

Страница 15: ...devices such as coils and across relay contacts When AC voltage is applied to coils they are converted to electromagnets Coils are used to operate AC devices such as solenoid dispensing valves and AC...

Страница 16: ...und follow this procedure 1 Connect a 12 gauge green stranded wire to the grounding terminal near the terminal block in the electronic head 2 Pull the wire through the rigid metal conduit and connect...

Страница 17: ...101073 Rev B 3 99 13 Figure 10A 2211 Series Remote...

Страница 18: ...101073 Rev B 3 99 14 Figure 10B 2212 Series Remote...

Страница 19: ...101073 Rev B 3 99 15 Figure 10C 2222 Series Remote...

Страница 20: ...101073 Rev B 3 99 16 Figure 10D 2224 Series Remote...

Страница 21: ...101073 Rev B 3 99 Figure 11A 2211 Series Self Contained 17...

Страница 22: ...101073 Rev B 3 99 18 Figure 11B 2212 Series Self Contained...

Страница 23: ...101073 Rev B 3 99 Figure 11C 2222 Series Self Contained 19...

Страница 24: ...101073 Rev B 3 99 Figure 11D 2224 Series Self Contained 20...

Страница 25: ...073 Rev B 3 99 FIELD WIRING CONDUIT INSTALLATION All field wiring must be routed through wire clips as shown in Figure 12 WARNING Do not leave extra wire length when routing the field wiring Figure 12...

Страница 26: ...101073 Rev B 3 99 The Customer must supply field conduit as shown in Figure 13 Figure 13 All 2200 Series 22 R R...

Страница 27: ...d wire routing clips See Figure 12 6 Shorten field wiring to appropriate length when making connection Do not leave excess wire See Figure 12 7 Attach data wires to power board in head and AC power wi...

Страница 28: ...eakers and all other circuit breakers to the dispenser Make sure the 12 gauge green ground wire is properly terminated near the GND Terminal on the power board and measures 1 ohm or less resistance to...

Страница 29: ...ose and lock the lower door panels and replace the upper door 3 Turn the circuit breaker for the system on 4 Purge the air from the system 5 Dispense a small amount of fuel from each hose to verify al...

Страница 30: ...pulling the pin and turning the dial until the next adjacent hole aligns with the same hub and reinserting the pin To calibrate the meter follow this procedure 1 Measure the actual delivery of the met...

Страница 31: ...2 Local Preset w Key Reset DES Keypad 0 None 1 DES Keypad Cash Acceptor 0 None 1 Cash Acceptor DCA 0 None 1 M ajor Oil DCA 2 Unbranded Option Pay 3 Unbranded Force Pay Vapor Recovery X None 1 Balanced...

Страница 32: ...tus of Warranty may be difficult to establish WARRANTY REGISTRATION WARRANTY REGISTRATION CARD A separate registration card must be filled out for each piece of equipment at the site including the I C...

Страница 33: ...country in which the product is installed Bennett Marketing Services can be contacted by mail facsimile telephone or e mail at the locations specified below Bennett Pump Company Marketing Services 121...

Страница 34: ...tion Manual is accurate at the date of publication The intent of this manual is to assist If further assistance is required please contact the Bennett Technical Service Department at 1 800 4 BENNET 1...

Отзывы: