Salt electrolysis installation
The salt chlorinator should be installed with the return line to the pool and through the water
treatment line as shown in the diagram. A control valve must be installed on the main line.
Before installing the salt chlorinator, make sure that the water flow matches the direction indicated
by the chlorinator.
To connect the pipes, use only line suitable for PVC bonding.
The chlorinator should be installed in a well-ventilated area to allow it to cool properly.
Do not install in an area where the electronic components of the chlorinator may be damaged by
moisture or rain.
During operation, the chlorinator should avoid direct sunlight to prevent the aging process of the
housing.
Make the electrical connections in such a way that:
-
The salt electrolysis and acid pump cannot operate when the filter pump is not working.
- The salt electrolysis and acid pump can be turned off when the filter pump is operating.