
233
146876
Index F
18.4 UPPER LIMIT OF ANTIFOUL
The boat's hull has a shallow indent moulded along its length: the upper marking corresponds to the upper limit of antifoul
on the hull.
18.5 LAUNCH/LIFT OUT
The initial commissioning of your boat will require a lot of skill and care. The proper working of all your boat's equipment
is the result of the quality of the commissioning operations. This is why the initial launch must be overseen by your dealer.
Before launching
- Replace the log in its housing.
- Check the cleanliness of the sea water strainers.
- Check the anodes (see the chapter on Electricity).
- Check the propeller (see the chapter on Steering).
- Prepare enough fenders and lines.
- Check the engine's sea water intake valve and the fuel feed valve (see the chapter on motorisation).
18.6 STEPPING/UNSTEPPING THE MAST
The stepping /unstepping operations require the skills of a professional rigger: please consult your dealer.
Do not remain onboard or beneath the boat
during the handling operations.
- Before any handling, make sure that the
gear lever is in the forward position (Dock and
Go version).
- When placing the slings make sure that the
positioning marks are still visible.
- Submerge the sling fully under the engine
mounting.
Handling, tran
sport
18
18
Содержание OCEANIS 55
Страница 1: ...146876 Index F OCEANIS 55 OWNER S MANUAL ...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 12: ......
Страница 13: ...13 DESIGN CATEGORIES AND DISPLACEMENT Boats n 1 to n 4 14 Boats from the hull N 5 15 Design categories 16 2 ...
Страница 17: ...17 STABILITY AND BUOYANCY Stability data 18 Access to the boat 19 3 ...
Страница 20: ...20 146876 Index F Access to the crew cabin Ladder Fitting Holding Stability and buoyancy ...
Страница 26: ...26 146876 Index F STEP Rigging and sails ...
Страница 28: ...28 146876 Index F STEP Rigging and sails ...
Страница 54: ......
Страница 61: ...61 ELECTRICAL SYSTEM General information about the electrical system 62 DC installation 63 AC system 78 8 ...
Страница 89: ...89 LIQUEFIED PETROLEUM GAS LPG SYSTEM LPG The onboard gas system 90 Layout diagram 93 9 ...
Страница 94: ......
Страница 104: ......
Страница 105: ...105 AUDIO VISUAL EQUIPMENT Television 106 Hifi 107 Layout diagram 108 11 11 ...
Страница 124: ...124 146876 Index F 11 6 2 Generator LAYOUT DIAGRAM Onboard comfort ...
Страница 164: ......
Страница 171: ...171 146876 Index F DIAGRAM OF THE LAYOUT Engine 14 14 ...
Страница 172: ...172 146876 Index F Engine ...
Страница 173: ...173 146876 Index F Detail B 17 17 16 13 1 16 9 4 2 1 3 Engine 14 14 ...
Страница 196: ......
Страница 197: ...197 STEERING SYSTEM General points 198 Layout diagram 199 Bow thruster 204 15 15 ...
Страница 199: ...199 146876 Index F 15 2 LAYOUT DIAGRAM 25 22 F 16 Steering system 15 15 ...
Страница 200: ...200 146876 Index F 26 9 20 2 21 24 Steering system ...
Страница 201: ...201 146876 Index F 3 22 4 5 6 7 8 23 24 11 13 14 15 19 9 10 12 Steering system 15 15 ...
Страница 202: ...202 146876 Index F 22 1 24 25 17 18 20 14 1 1 Steering system ...
Страница 222: ......
Страница 223: ...223 HULL FITTINGS Upholstery 224 Interior woodwork 227 Interior maintenance 227 Safe 227 17 17 ...
Страница 228: ......
Страница 235: ...235 146876 Index F 18 8 TRANSPORT Packing plan Note Measurements are expressed in mm Handling transport 18 18 ...
Страница 236: ......
Страница 237: ...237 ENVIRONMENT Waste management 238 19 19 ...