STEP 1
(Selecting Site)
Before installing your new lift, check the following.
1.
LIFT LOCATION
: Always use architects plans when
available. Check layout dimension against floor plan
requirements making sure that adequate space if avail-
able.
2.
OVERHEAD OBSTRUCTIONS
: The area where the
lift will be located should be free of overhead obstruc-
tions such as heaters, building supports, electrical lines
etc.
3.
DEFECTIVE FLOOR
: Visually inspect the site where
the lift is to be installed and check for cracked or defec-
tive concrete.
4.
OPERATING TEMPERATURE.
Operate lift only
between temperatures of 41° -104° F.
5. Lift is designed for
INDOOR INSTALLATION ONLY.
Outdoor use permitted only if covered and dry. Always
follow warnings illustrated on equipment labels.
STEP 2
(Floor Requirements)
This lift must be installed on a solid level concrete
floor with no more than 3-degrees of slope. Failure
to do so could cause personal injury or death.
A level floor is suggested for proper use and installa-
tion and level lifting. If a floor is of questionable slope,
consider a survey of the site and/or the possibility of pour-
ing a new level concrete slab.
t
DO NOT
install or use this lift on any asphalt surface
or any surface other than concrete.
t
DO NOT
install or use this lift on expansion seams
or on cracked or defective concrete.
t
DO NOT
install or use this lift on a second / elevated
floor without first consulting building architect.
CONCRETE SPECIFICATIONS
LIFT MODEL CONCRETE REQUIREMENTS
HD-14T
4” Min. Thickness / 3,000 PSI
DANGER!
All models MUST be installed on 3000 PSI concrete only
conforming to the minimum requirements shown above.
New concrete must be adequately cured by at least
28 days minimum.
IMPORTANT NOTICE !
These instructions must be followed to insure proper installation and operation of your lift.
Failure to comply with these instructions can result in serious bodily harm and void product warranty.
Manufacturer will assume no liability for loss or damage of any kind, expressed or implied resulting
from improper installation or use of this product.
PLEASE READ ENTIRE MANUAL PRIOR TO INSTALLATION!
t
Rotary Hammer Drill or Similar
t
3/4” Masonry Bit
t
Hammer
t
4 Foot Level
t
Open-End Wrench Set: SAE/Metric
t
Socket And Ratchet Set: SAE/Metric
t
Hex-Key / Allen Wrench Set
t
Large Crescent Wrench
t
Large Pipe Wrench
t
Crow Bar
t
Chalk Line
t
Medium Flat Screwdriver
t
Tape Measure: 25 Foot Minimum
t
Needle Nose Pliers
TOOLS REQUIRED
NOTE:
An air supply (30 PSI / 3 CFM Min.) will be required for the safety-lock mechanisms. See Step 11
Содержание 5595139
Страница 8: ...8 Assembly View ...
Страница 23: ...23 ...
Страница 28: ...28 HD 9 12X 14 Rolling Jack Air Line Kit Installation Part 5174009 REV 01 06 09 ...
Страница 29: ...29 Adapter Plate Required for HD 9 12 14 Adapter Plate Required for HD 9 12 14 ...
Страница 34: ...34 ...
Страница 35: ...35 ...
Страница 44: ...44 ...
Страница 49: ...49 This page intentionally left blank ...
Страница 50: ...50 This page intentionally left blank ...
Страница 51: ...51 This page intentionally left blank ...