5. The Columns and Cross Tubes will now be in position
and spaced properly for the runways.
6. Install the column TOP CAPS using the M16 x 2 Hex
Bolts, nuts & washers. Turn the jam nut on each Safety
Ladder is touching the Ladder and the TOP CAP.
NOTE: The Ladder must never rest on the base of the
column or damage to the lift will occur. Be sure to position
the Cable hole INWARD. (See Fig. 3.6 - 3.7)
STEP 4
( Raising The Cross Tubes )
1. Before proceeding it will be necessary to first raise the
Cross Tubes off the ground to facilitate Cable routing and
final assembly.
2. Manually raise the Cross Tubes until the Primary
Safety Locks engage and rest on the third or fourth lock
position or approximately 24” off the ground. It is impor-
tant that the SLACK SAFETY LOCK IS CLEARED. The
Slack Safety Lock must never rest on the Safety Ladder.
(See Fig. 4.1).
3. The Columns and Cross Tubes will now be in position
and spaced properly for the Runways. Be very careful not
to disturb the Columns and Cross Tubes at this time as
they may tip over causing personal injury or harm.
(See Fig. 4.4)
DANGER!
Be careful not to disturb the Columns and Cross Tubes
as they may tip over causing personal injury or harm
IMPORTANT NOTE !
It is important that the SLACK SAFETY LOCK IS
CLEARED. The slack safety lock must never
rest on the safety ladder.
Fig 3.6
Fig 3.7
Fig 4.1
Fig 4.2
Fig 4.3
Fig 4.4
Содержание 5595139
Страница 8: ...8 Assembly View ...
Страница 23: ...23 ...
Страница 28: ...28 HD 9 12X 14 Rolling Jack Air Line Kit Installation Part 5174009 REV 01 06 09 ...
Страница 29: ...29 Adapter Plate Required for HD 9 12 14 Adapter Plate Required for HD 9 12 14 ...
Страница 34: ...34 ...
Страница 35: ...35 ...
Страница 44: ...44 ...
Страница 49: ...49 This page intentionally left blank ...
Страница 50: ...50 This page intentionally left blank ...
Страница 51: ...51 This page intentionally left blank ...