background image

5

Valves included in this field action were 

manufactured during the period:

January 1, 2014 through March 4, 2016

That is, A 01 14T through C 04 16T

_1 A 01 14 T SSS

Month – A through M 

Skipping

 

I

Shift of 

Manufacture 

(Optional)

Year 

14, 15, or 16

Manufacturing 

Plant

Day of Month 

01 through 31

Work Team 

Number 

(Optional)

Shift  

Serial Number 

(Optional)

Bendix SR-5 Valve 

Date Code 

Location

Supplier  

Code Location

Figure 9 – Recall Identification 

RECALL DOCUMENTATION

After  finishing  the  Bendix

®

 SR-5

 valve repair, complete 

the Recall Claim Form (4) provided. This documentation is 

required for labor reimbursement and for NHTSA completion 

verification. 

RECALL GUIDELINES

Note: Bendix SR-5 valves with a green or black tie wrap 

through the identification hole in the body have already been 

repaired. 

 No further servicing is required. 

(Refer to Figure 2.)

The SR-5 valves covered by this campaign can be identified 

by the supplier code and the date of manufacture located on 

the valve body. Verification of 

both is required to determine if 

the valve is a part of the campaign.  Valves covered by this 

campaign must meet the following criteria:
1.  The supplier code – “IKD” – located as shown in Figure 9; 

and

  

2.  The date of manufacture between January 1, 2014 and 

March 4, 2016, inclusive. To verify the date code see 

INTERPRETING THE DATE CODE below.

INTERPRETING THE DATE CODE

A date code is stamped (not cast) on the SR-5 valve body 

housing. 

Locate the date code – removing the paint coating, 

if necessary – to read the code.  

Disregard the Work Team 

Number, Shift of Manufacture, Manufacturing Plant and Shift 

Serial Number codes shown in gray below.  The portion of the 

date code that determines the date of manufacture is highlighted 

and can be interpreted as follows:
• 

The first field is the month (A = January, B = February, etc. 

– excluding the letter 

I

 – so that J = September, and so on),

• 

The next two fields are the day of the month (e.g. 01 = 1

st

); and

• 

The next two fields are the year (e.g. 14 = 2014).

Отзывы: