BENDIX SR-4 SPRING BRAKE CONTROL VLV Скачать руководство пользователя страница 3

3

FIGURE 3 - 

SR-4

 VALVE ANTI-COMPOUNDING PLUMBING

TRAILER SUPPLY LINE

RES. #2

R-12

 

RELAY 

VALVE

TRAILER SERVICE LINE

ANTI-COMPOUNDING 

CONNECTION

SINGLE CHECK 

VALVE

RES. #1

PREVENTIVE MAINTENANCE

Important:

 Review the Bendix Warranty Policy before 

performing any intrusive maintenance procedures. A 
warranty may be voided if intrusive maintenance is 
performed during the warranty period.

No two vehicles operate under identical conditions, as 
a result, maintenance intervals may vary. Experience is 
a valuable guide in determining the best maintenance 
interval for air brake system components. At a minimum, 
the SR-4

 valve should be inspected every 6 months or 

1500 operating hours, whichever comes fi rst, for proper 
operation. Should the SR-4

 valve not meet the elements 

of the operational tests noted in this document, further 
investigation and service of the valve may be required.

SERVICE AND LEAKAGE TESTS

Check the tractor dash gauge against a test gauge known 
to be accurate prior to performing these tests. Connect 
the tractor air lines to the trailer on which the SR-4

 trailer 

spring brake valve is to be tested. Block all wheels or hold 
both vehicles by a means other than air brakes.

1.   Install two separate test gauges or one dual test gauge 

with one line to the #1 reservoir and the other line to the 
#2 reservoir. Build the tractor and trailer to full system 
pressure by placing the trailer supply valve in the charge 
position and the parking control valve in the "brakes 
released" position.

Note: 

As system pressure reaches approximately 60 
p.s.i., the #2 reservoir and the spring brakes 
should build up to approximately 60 p.s.i. before 
the #1 reservoir begins to charge (see Fig. 3). 
When full system pressure has been reached and 
the spring brakes fully released, it is acceptable 
to have a slightly lower pressure reading in the 
service reservoirs than is registered on the dash 
gauge. Apply a soap solution to the exhaust port 
and the vent. Leakage of a 1" bubble in 5 seconds 
is permissible.

2.   Place the trailer supply valve in the exhaust position; 

the spring brakes should apply. Disconnect the trailer 
supply line and soap the hose coupling to check 
for leaks. A 1" bubble in not less than 5 seconds is 
permissible.

3.   Reconnect the trailer supply hose coupling and recharge 

the trailer system. The spring brakes should release. 
Shut off the engine, leaving the ignition on and open the 
drain cock on the #1 reservoir. The tractor air system 
should bleed down to approximately 55 p.s.i. with low 
pressure, indication occurring at or before 60 p.s.i. The 
#2 reservoir on the trailer should also bleed down to 
approximately 55 p.s.i. but the spring brakes on tractor 
and trailer should remain released. After the system is 
stabilized, leakage at the open drain cock in the trailer 
should not exceed a 1" bubble in 5 seconds.

Содержание SR-4 SPRING BRAKE CONTROL VLV

Страница 1: ...SEMBLY The SR 4 valve may be identified by the metal tag affixed to the cover by one of four cap screws Porting is as follows 1 2 inch NPT or 3 4 inch NPT spring brake supply port for reservoir mounti...

Страница 2: ...protection valve will escape through the 2 reservoir and will not be able to resupply the 1 reservoir The 1 reservoir will retain full pressure because of the pressure protection check valve and chec...

Страница 3: ...reservoir Build the tractor and trailer to full system pressure by placing the trailer supply valve in the charge position and the parking control valve in the brakes released position Note As system...

Страница 4: ...res deactivate the electrical system in a manner that safely removes all electrical power from the vehicle 6 Never exceed manufacturer s recommended pressures 7 Never connect or disconnect a hose or l...

Страница 5: ...r to the body 5 Remove the cover seal ring 7 control piston assembly and spring 8 from the valve body 6 From the control piston 9 remove the three o rings 10 11 12 7 Remove the reservoir port fitting...

Страница 6: ...g 6 from the base of the bore Remove the o rings 7 8 from the piston 6 Remove the check valve assembly from the main body by lightly clamping the body in a vise and turning the check valve assembly co...

Страница 7: ...ipe plugs Torque to 140 170 inch pounds ASSEMBLY EXHAUST CHECK VALVE 1 If so equipped position the diaphragm 19 washer 18 and screw 17 in the control piston exhaust port Torque the screw from 15 to 25...

Страница 8: ...cle Systems LLC All rights reserved 7 2007 Printed in U S A OPERATING AND LEAKAGE TESTS Check the tractor dash gauge against a test gauge known to be accurate prior to performing these tests Connect t...

Отзывы: