5.3.4
Carrying out the functional test
The functional test follows the electrical part of the test.
5.3.5
Recording the test result
5.3.5.1
Displaying the test result
Once the functional test has been completed, the result of the test is displayed in accordance
with the system administration setting (see “Test result” on page 49). If the test result is not
displayed immediately, it can be called up as described in the following menu.
F1
The functional test is assessed as “passed”.
F2
The functional test is assessed as “failed”. The entire test is saved as “failed”.
F3
Power up the DUT by connecting it to the UNIMET® 1100ST test socket. Please
note the manufacturer’s instructions when doing this.
Three-phase DUTs and DUTs with power consumption levels higher than
3700 VA cannot be supplied with power via the test socket. Connect these
DUTs directly to the designated system voltage.
1
Name of test
2
If the DUT has failed the test, this message will appear.
3
Sequence of test steps See also "Chapter 9.2 Test steps".
4
Test steps which the DUT has failed are marked with
*
.
5
Measured value and unit
Exit test results. Go to the "Classification" menu.
,
Scroll test results
Detailed display of all test steps (long-format printout possible)
Prints the test result (short-format printout)
1
3
4
2
5
<<
i
Содержание UNIMET 1000ST
Страница 50: ...Operation and setting 50 TGH1256en 10 2005...
Страница 80: ...PC compatible functions of the UNIMET 1100ST 80 TGH1256en 10 2005...
Страница 82: ...Maintenance and calibration 82 TGH1256en 10 2005...
Страница 90: ...Options and accessories 90 TGH1256en 10 2005...
Страница 96: ...Data 96 TGH1256en 10 2005...
Страница 99: ......