![Bender ISOMETER isoLR275 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/bender/isometer-isolr275/isometer-isolr275_manual_2731668025.webp)
Commissioning flow chart (in three parts)
25
isoLR275_D00127_00_M_XXEN/07.2018
Commissioning of the ISOMETER® (3)
In order to check the proper
connection, a functional test
using a suitable resistance is
to be carried out.
Size of the resistance:
50% of the preset response
value Alarm 2.
Check the connecting leads !
Is voltage Un applied to the
terminals L1/L2 ?
of the coupling device AGH-LR?
Check the voltages with a suitable
voltmeter !
yes
yes
Remove the resistor !
isoLR is correctly
connected and functions reliably !
Do both alarm LEDs light up?
Did the alarm relays switch ?
yes
no
Do both alarm LEDs light ?
Did the alarm relays switch?
Alarm LEDs extinguished ?
Did the output relays change
their position ?
no