Installation, connection and commissioning
20
4.3
Commissioning / factory setting
Material damage by improper connection of the device!
Prior to commissioning make sure that the device is
properly connected!
Undervoltage < U:
Overvoltage
> U1:
Overvoltage
> U2 (10 min.):
Hysteresis U:
Underfrequency < Hz
Overfrequency > Hz
Hysteresis frequency (Hys Hz):
Fault memory M:
Operating principle K1
(< U, > U1, Asy, < f, > f, S.AL):
Operating principle K2
(Err, < U, > U1, > U2, Asy,
< f, > f, PHS, S.AL):
AL1/AL2 indicate the alarm
state of K1/K2 (LEd):
Alarm to K1/K2 (S.AL) when
the device is started:
Asymmetry:
Phase sequence monitoring:
Start-up delay:
Response delay:
Delay on release:
Method of measurement:
Password:
184 V
264 V
253 V
5 %
47.5 Hz
50.2 Hz
0.1 Hz
OFF
N/C operation (n.c.)
N/C operation (n.c.)
OFF
on
30 %
R, on
t = 30 s
t
on1
= 0,1 s
t
on2
= 0,1 s
t
off
= 30 s
3n (phase voltage measurement)
126, On
Содержание B 7301 0020
Страница 6: ...How to use this documentation effectively 6 TGH1444en 04 2011...
Страница 14: ...Function 14 TGH1444en 04 2011...
Страница 52: ...Technical data 52 TGH1444en 04 2011...
Страница 55: ......