
Doc 0203120 rev O
Page 31 of 32
Not subject to issue control when printed
Use of test fixture is mandatory for all Milano BTE during DSA6000 final HI testing. To use the fixture, place the HI in the fixture according to pic.
Place it in the test chamber as shown and select the correct test tpix and make sure to follow instructions coming up on the screen. During the test
programme execution the IAD calibration will be performed at the appropriate time. Another bennefit from the fixture is that the HI is in a well defined
position so the telecoil test can be performed without any interaction from the operator.
If a tinnitus breaker version (TBR) is prefered, the TBR option should be chosen
Test tubing is normal 20 mm effective lenght
as for all AUDIOmaster BTE testing
Place the HI in test chamber as shown
20 mm
Testing
2cc coupler
p/n 30-4838800
2cc coupler insert BTE
p/n 40B4609601
Both coupler parts can be ordered with GTO
Dept/HQ Ballerup DK