16
With Steel hob
To prevent leakage of liquid between the frame of the hob and
the worktop, put the insulating seal provided in position before
assembly.
1. Install the product into the worktop cut-out and use a pencil to
draw a line along the product outer edges.
2. Take out the product and place the adhesive seal provided
along the line you drew in step 1. Use light pressure to make
the seal stick to the worktop.
3. Install the product again, Use light pressure to make the seal
stick to product edge.
4. Carefully trim the surplus edge away from the seal.
5. Clean the edge of the hotplate and the area of the worktop
immediately adjacent to the appliance.
Содержание GHU60
Страница 1: ...Belling GTG GHU 60 75 Date 17 04 20...