3
1
2
4
.
6
Installation of the outdoor panel
The outdoor panel is installed at the entrance of the property or building, on the body closest
to the access door, at a height of approx. 1.7 m (upper part) from the ground, protected from
rain and sunrays. The outdoor panel keys numbering is from the bottom up, the first key
meaning address 1.
-5 cm
-5 cm
Before starting...
The outdoor panel is installed at the
entrance to the building, on the body
closest to the entrance door.
Torx screw
20
cm
Cable length
The frame of the
case must be at
the level of the
wall's surface.
Cable length
170 cm
Lateral view
Back view
Frontal view
Name display of inhabitant
Remove the plastic pad from
the keyboard module
Remove the plastic pad from the keyboard module
Insert the pad back in the
keyboard module
Torx
screw
23/92