Installation SPIDER-SL PoE
Release 01 05/2019
23
Proceed as follows:
Ensure the required conditions for connecting the supply voltage.
See “Requirements for connecting electrical wires” on page
Pull the terminal block off the device.
Connect the ground connection.
Connect the power supply cables.
Plug the terminal block into the connection on the housing.
2.6
Operating the device
By connecting the supply voltage via the terminal block, you start the
operation of the device.
2.7
Connecting data cables
Note the following general recommendations for data cable connections
in environments with high electrical interference levels:
Keep the length of the data cables as short as possible.
Use optical data cables for the data transmission between the
buildings.
When using copper cables, provide a sufficient separation between
the power supply cables and the data cables. Ideally, install the
cables in separate cable channels.
Verify that power supply cables and data cables do not run parallel
over longer distances, and that ideally they are installed in separate
cable channels. If reducing the inductive coupling is necessary, verify
that the power supply cables and data cables cross at a 90° angle.
Use shielded cables (SF/UTP cables as per ISO/IEC 11801:2002).
Beware of possible short circuits when connecting a cable section
with conductive shielding braiding.
Connect the data cables according to your requirements.
Содержание Hirschmann SPIDER Standard Line Series
Страница 34: ......