QUAD WAVE MITTER
™
16
Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
1MANUL633
Installation
Utilities
Electrical
CAUTION
–
IT IS RECOMMENDED THAT A LICENSED ELECTRICIAN IS
CONTRACTED TO PERFORM ALL ELECTRICAL INSTALLATIONS.
1) Supply 3-phase power to the motor on top of the frame assembly.
Overhead View
Water manifold
Water manifold
Gearbox
Main electrical feed
Содержание Quad Wave Mitter
Страница 1: ...Quad Wave Mitter 1MANUAL633 Rev13 Quad Wave Mitter ...
Страница 2: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......