4
INSTALLATION INSTRUCTION
FIG.5 - RECOMMENDED CONNECTING CABLE
Recommended Tightening
torque
0.5 - 0.6 Nm
4.42 - 5.30 lbf in
Solid: 2.5 mm² / 12 AWG
Stranded:1.5 mm² / 12 AWG
L: 6.0 - 7.5 mm / 0.24 - 0.30 in
FIG.6 - INPUT PROTECTION
Fuse 6.3AT or MCB 6 A C curve or 4 A D curve.
For USA and Canada, use the fuse type closest to the European equivalent type.
Surge protection: it is strongly recommended to provide external surge arresters (SPD) according to local regulations.
FIG.7 - INPUT CONNECTIONS
AC LINE – SINGLE PHASE
AC LINE – TWO PHASES
AC LINE – THREE PHASES
DC LINE
FIG.8 - ENVIRONMENT
OPERATING TEMPERATURE
DERATING
- 40°C to + 70°C
5 - 95% r.H. non condensing
UL Certified up to 50°C
- 4.2 W / °C over 50°C
NOTES:
Data may change without prior notice in order to improve the product.
Please refer to the latest version of the Installation Instruction for each product by visiting
ACCESSORIES
LDX-D20
20 A Active ORing controller
LDX-D50 50 A Active ORing controller
LDX-U20
20 A High performance DC UPS
LDX-B20
150J Buffer Module
LDX-C120
Battery charger and DC UPS Module
LDX-L30
Sealed Lead acid Battery pack