
6.3 Assembly of BM12 CO PN63
For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Prerequisites
Tools
Material
Protective equipment
• e.g. adjustable spanner
• Sealants
• Feed line and discharge line
Always to be worn:
Preparatory tasks
1.
Depressurise the compressed gas system or the respective system section and secure it against unintentional
pressure build-up.
2.
Note the specified assembly instructions at all times.
Illustration
Description / explanation
44
3. Remove the dust cap
[44]
.
C
D
Assembly instructions
• The gradient of the condensate inlet line
[C]
must be ≥3
%.
•
Do not mount any filters in the condensate inlet line
[C]
.
• The diameter of the condensate inlet line
[C]
must be
≥1/2" (inner diameter ≥13 mm (0.5")).
•
Recommended interval:
Equip the condensate inlet line
[C]
with a shut-off
valve
[D]
to make simple product maintenance possible.
4. For the condensate inlet line
[C]
apply sealant to the
end of the pressure-resistant pipe and screw in at the
condensate inlet.
E
F
G
Assembly instructions
• The condensate discharge line
[F]
may be laid rising
by max. 5 m (17 ft). The minimum pressure required
increases by 0.1 bar (1.5 psi) per metre of incline.
• The diameter of the manifold
[G]
must be ≥1/2" and the
gradient ≥3 %.
•
Do not use shut-off valves in the condensate discharge.
5. For the drain, connect a short pressure hose
[E]
(designed for the system pressure) to the condensate
discharge and the condensate discharge line
[F]
.
BEKOMAT
®
12, 12 CO, 12 CO PN63
Original installation and operation manual
24 | 64