Copyright © 2019 TTAAll Rights Reserved.
Product Introduction
8
Head direction
with an arrow
Figure 3
Figure 4
Combine well
Figure 5
Figure 6
Marking on the corresponding position of the fuselage and water tank kit as the
Figure1-2.
(TTA label is the head direction,tank lid is the tail direction)
1) Put the fuselage bottom upward as the Figure1.
2) Install the fuselage and the water tank kit according to the mark ,1-3,2-4. It will be
completed like Figure3.
3) Marking on the corresponding position of the 6 landing gears as Figure 4.
4) Slip the landing gear gently into the fillister mark 7. of fuselage as the “Mounting
Direction” arrow of Figure5. Make the bulge mark 5. stuck into the fillister mark 8 and
the part mark 6 get into the fillister mark 9 as the “Limit Direction” arrow to complete
the installation.
5) The rest 5 landing gears should be installed as above. It will be completed like Figure