background image

H-T40m

Installation and Operation Manual

MAEN945B, 2009-03

English

Cover_MAEN945B.fm  Page 1  Thursday, February 26, 2009  2:01 PM

Содержание H-T40m Series

Страница 1: ...H T40m Installation and Operation Manual MAEN945B 2009 03 English Cover_MAEN945B fm Page 1 Thursday February 26 2009 2 01 PM...

Страница 2: ...entire installation manual prior to installing and using this equipment Only qualified per sonnel may install operate or repair this equipment Beijer Electronics AB is not responsible for modified alt...

Страница 3: ...sions 10 3 3 Mounting Procedure 11 3 4 Grounding 11 3 5 Power Supply and Wiring 12 4 Dip Switches 13 5 Communication Port 14 6 Operation 15 6 1 Self Test 15 6 2 System Menu 16 6 3 Bench and Function T...

Страница 4: ...Contents Beijer Electronics MAEN945B...

Страница 5: ...ills the requirements of article 4 of EMC directive 2004 108 EC Storing the operator terminal where the temperature is lower higher than recommended in this manual can cause the LCD display liquid to...

Страница 6: ...es must be separated from power cables for operational circuits Only use shielded cables to avoid unpredictable problems During Use Emergency stop and other safety functions may not be controlled from...

Страница 7: ...AEN945B 7 2 Installation 2 1 Package Contents The following parts are found in the box Operator terminal H T40m 4 installation fasteners Power connector connected to the 24 V DC power input Installati...

Страница 8: ...s with rechargeable lithium battery Display Mono FSTN LCD 16 shades of gray 240 x 240 pixels LED backlight lifetime approximately 10 000 h at 25 C Active area of display W x H 58 5 x 58 5 mm 30 x 30 c...

Страница 9: ...duct Specifications Beijer Electronics MAEN945B 9 3 1 Description of Parts Front Back Fixture Power lamp Communication lamp Display mounting holes DIP switches 1 10 COM1 RS232 RS422 RS485 DC power inp...

Страница 10: ...Product Specifications 10 Beijer Electronics MAEN945B 3 2 External and Cut out Dimensions CUTOUT DIMENSION...

Страница 11: ...the unit and fasten the screws into the front panel Do not tighten the screws with too much or uneven force or it may cause the deformation of the operator terminal 3 The operator terminal is to be i...

Страница 12: ...y into the power connector and then turn the screws tight 3 Plug in the connector to the power input of the operator terminal Use copper conductors only 60 75 C Warning To avoid an electrical shock be...

Страница 13: ...er for controller communication SW6 Password ON The operator terminal asks the operator to enter a password after power on self test OFF No password is required to start the operator terminal SW7 Syst...

Страница 14: ...ller via RS232 RS422 or RS485 Only COM1 can be used for download Note Make sure that the connection is in accordance with the setting of the dip switches for example RS485 corresponds to SW9 ON See se...

Страница 15: ...pplication checksum will not pass the self test in dicated by Failed in the self test results after power is restored If this happens the user can simply follow the download procedure to re download t...

Страница 16: ...ction Link The operator terminal is connected Confg Sets up the internal time clock and communication parameters in the operator terminal All the settings has to be made for the operator terminal to w...

Страница 17: ...on Parameters There are two ways to configure working parameters to set parameters in the operator terminal or in H Designer To set parameters in the operator terminal select Confg in the system menu...

Страница 18: ...nu command Set is used Then per form the following steps 1 Touch the upper left and lower right corners of the screen 2 Follow the route on the screen 3 Touch the square on the center of the screen to...

Страница 19: ...compile the file before downloading it The file has to be compiled every time a change has been made in the file before downloading it Then select Application Download Firmware Application in H Design...

Страница 20: ...l will prompt for a password enter the password set in H Designer from Application Workstation Setup Once the correct pass word is entered the operator terminal starts to upload the application to the...

Страница 21: ...menu from the operator terminal with the application to be copied The operator terminal will prompt for a password enter the pass word set in H Designer from Application Workstation Setup Once the co...

Страница 22: ...ght to access the table Touch the password to highlight an area for entering a value How to configure an Action Button is described in the H Designer User s Manual After registering passwords and user...

Страница 23: ...een button can be designed with a high level of security which means that a password with a high level of privilege is required in order to open the other screen As the button is selected and the curr...

Страница 24: ...er Electronics Co Ltd Room 201 Buildning B No 1618 Yishan Road Shanghai 201103 CHINA Tel 86 21 6145 0400 Fax 86 21 6145 0499 info beijerelectronics cn USA Beijer Electronics Inc 939 N Plum Grove Road...

Отзывы: