Installation
10
Beijer Electronics, MAEN965
3. Secure the operator panel in position, using all the fastening holes and the
provided brackets and screws:
4. Connect the cables in the specified order.
Use an M5 screw and a grounding conductor (as short as possible)
with a cross-section of minimum 2.5 mm
2
.
5. Carefully remove the laminated film, if applicable, over the operator panel
display, to avoid static electricity that could damage the panel.
x 13
0.5 - 1.0 Nm
B
C
D
A
Caution
Ensure that the operator panel and the controller system have the
same electrical grounding (reference voltage level), otherwise errors
in communication may occur.
Caution
- Use only shielded communication cables.
- Separate high voltage cables from signal and supply cables.
Caution
- The operator panel must be brought to ambient temperature
before it is started up. If condensation forms, ensure that the
operator panel is dry before connecting it to the power outlet.
- Ensure that the voltage and polarity of the power source is correct.
24V DC
RS422/RS485
24V DC
1
CF
CARD
B
A
C
D
RS232
Controller
Power
Ethernet
Содержание EXTER T100sr
Страница 1: ...EXTER T100sr Installation Manual MAEN965 2008 11 English...
Страница 4: ...Table of Contents Beijer Electronics MAEN965...
Страница 8: ...Safety Precautions 8 Beijer Electronics MAEN965...
Страница 12: ...Installation 12 Beijer Electronics MAEN965...
Страница 14: ...Technical Data 14 Beijer Electronics MAEN965...
Страница 18: ...Operator Panel Drawings 18 Beijer Electronics MAEN965 5 2 EXTER T100 Outline Drawing No S 5113 Date 2004 10 26...